Break-In Period; Operation During Break-In Period - Sea-doo SAR 2018 Series Operator's Manual

Table of Contents

Advertisement

BREAK-IN PERIOD

Operation During Break-In
Period
A break-in period of 10 operating hours
is required before running the water-
craft at sustained full throttle.
During this period, maximum throttle
should not exceed 1/2 to 3/4 opening.
However, brief full acceleration and
speed variations contribute to a good
break-in.
NOTICE
Continued
wide
open
throttle accelerations or operation,
prolonged cruising speeds are detri-
mental during the break-in period.
______________
62

Advertisement

Table of Contents
loading

Table of Contents