Break-In Period; Operation During Break-In Period - Sea-doo RXP-X 260 Operator's Manual

Hide thumbs Also See for RXP-X 260:
Table of Contents

Advertisement

BREAK-IN PERIOD

Operation During Break-In
Period
A break-in period of 10 operating hours
is required before running the water-
craft at sustained full throttle.
During this period, maximum throttle
should not exceed 1/2 to 3/4 opening.
However, brief full acceleration and
speed variations contribute to a good
break-in.
NOTICE
Continued wide open
throttle accelerations or operations
and prolonged cruising speeds are
detrimental during the break-in pe-
riod.
Break-In Mode
This model has a break-in mode pro-
grammed to ensure initial engine pro-
tection.
During the first 5 hours of operation,
the engine management limits the en-
gine maximum speed for engine pro-
tection. The engine performance will
progressively increase during this pe-
riod.
______________
62

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF