Revision History
Date
January 2011
February 2011
July 2011
August 2011
September 2011
October 2011
March 2012
July 2014
January 2015
August 2015
January 2016
PremierWave® Embedded System on Module Integration Guide
Rev.
Comments
A
Initial Draft
B
Added a zoom top assembly diagram.
C
Added mounting requirements and notes for the EN module clip.
D
Updated connector and tolerance information, the mechanical
dimension diagrams and the evaluation board power supply circuitry
diagram.
E
Added Power Supply information with a new diagram and specified
information about general purpose IO signals.
F
Updated end product labeling information.
G
Updated information on maximum input leakage current and module
initial power up sequence.
H
Added content pertaining to the PremierWave SE1000 module and
updated images and input signal information.
I
Updated compliance, USB host port and product label information.
J
Updated reset signal information.
K
Updated minimal signal voltage and drive strength information.
4
Need help?
Do you have a question about the PremierWave EN and is the answer not in the manual?