Receiving And Installation; Receiving & Inspection; Location Considerations; Mechanical Installation - Baldor KPD007 Installation & Operating Manual

Hmi operator panel
Table of Contents

Advertisement

Section 2

Receiving and Installation

Receiving & Inspection
packaged for shipment. When you receive your shipment, there are several things
you should do immediately.

Location Considerations

that is protected from direct sunlight, corrosives, harmful gases or liquids, dust,
metallic particles, and vibration. Exposure to these can reduce the operating life.

Mechanical Installation

The HMI Panel is designed to be installed in an enclosure opening. The opening
size requirements are specified in Section 6 of this manual.
Note: Each time the panel is removed, the gasket should be replaced.
Thick Gasket
MN1272
Baldor products are thoroughly tested at the factory and carefully
1.
Observe the condition of the shipping container and report any damage
immediately to the commercial carrier.
2.
Remove the product(s) from the shipping container and remove all
packing materials. The container and packing materials may be retained
for future shipment.
3.
Verify that the part number(s) are the same as the part number(s) listed
on your purchase order.
4.
Inspect for external physical damage that may have been sustained
during shipment and report any damage immediately to the commercial
carrier.
5.
If the product is to be stored for several weeks before use, be sure that it
is stored in a location that conforms to published storage humidity and
temperature specifications stated in Section 6.
The location of the control is important. Installation should be in an area
1.
Determine the correct hole size for your panel.
2.
Locate and cut the "Cutout" in your enclosure. Be sure the edges of the
cutout are straight and debur any sharp edges.
3.
Apply Thin gasket: (Figure 2-1 and Figure 2-2). The gasket should be
applied around the cutout. The gasket should be applied starting at the
middle of the lower side being careful to keep it straight. The two ends
of the gasket should meet without overlap.
Figure 2-1 Application of Gaskets
CUT–OUT
Receiving & Installation 2-1
Thin Gasket

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kpd008Kpd009–501Kpd009–502

Table of Contents