Section 3
Start-Up
Power Off Checks
Before you apply power, it is very important to verify the following:
Power On Checks
This procedure applies to the all panels.
Figure 3-1 Panel Layout Description (see Table 3-1)
KPD007 Panel
KPD009 Panel
MN1272
1.
Verify the panel is securely mounted to the enclosure opening.
2.
Verify the gaskets are in place and slightly compressed but not flattened.
3.
Verify the power supply voltage matches the panel's rated voltage.
4.
Inspect all connections for accuracy, workmanship and tightness.
5.
Verify that all wiring conforms to applicable codes.
6.
Verify that the panel is properly grounded to earth ground.
1.
Apply power to the panel.
2.
Verify that all LED's are ON briefly during self test at power up. After
self test is complete, only the
remain ON.
Run LED and
Communication LED
A
B
C
D
E
F
G
H
I
Q
R
S
T
U
V
W
X
Y
<
>
(
)
%
#
@
*
7
8
9
4
5
6
r
0
1
2
3
KPD008 Panel
!
J
K
L
M
N
O
P
.
,
;
:
Z
/
?
SP
BSP
2nd
Shift
Start-Up 3-1