Power Specifications - Avaya 2500 Series Regulatory Information

Ethernet routing switch
Hide thumbs Also See for 2500 Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Rack requirements:
A space of 2.8 inches for each switch in an EIA or IEC standard 19 inch (48.2 centimeter)
equipment rack.
• The rack must be bolted to the floor and braced, if necessary.
• The rack must be grounded to the same grounding electrode used by the power service in
the area. The ground path must be permanent and must not exceed 1 ohm of resistance
from the rack to the grounding electrode.
The following figures provide instruction for installing the switch in a rack.
Attach a bracket to each side of the switch.
Slide the switch into the rack. Insert and tighten the rack mount screws.

Power specifications

Regulatory Information for the Avaya Ethernet Routing Switch 2500 Series
Before you begin
November 2010
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2526t2550t2550t-pwr2526t-pwr

Table of Contents