TREND IQ251 Installation Instructions Manual
TREND IQ251 Installation Instructions Manual

TREND IQ251 Installation Instructions Manual

Hide thumbs Also See for IQ251:

Advertisement

Important: Retain these instructions
These instructions shall be used by trained service personnel only
If the equipment is used in a manner not specified by these instructions, the protection provided by the equipment may be impaired.
ConTenTs
1
Unpacking .....................................................................1
2
Storing ...........................................................................1
3
Installation .....................................................................1
3.1
Installation - Mounting ...................................................1
3.2
Installation - Configuration ............................................7
1
UnpaCkIng
2
sToRIng
+50 °C
-10 °C
(122 °F)
(14 °F)
3
InsTallaTIon
3.1
Installation - Mounting
Dimensions
1
30 mm (2")
IQ251
550 mm (21.7")
c
IQ251
IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012
0
90 %RH
H O
2
30 mm (2")
175 mm (6.9")
+45 °C
0 °C
d
(113 °F)
(32 °F)
0 %RH
90 %RH
H O
2
altitude: <2000m (6562 ft)
Installation Instructions
4
Mounting in an Enclosure, ENCLS/.............................12
5
6
Replacing the Battery ..................................................13
7
Zero Address/Baud Rate Switch Reset ......................15
8
Replacing the Fuse .....................................................16
/24VAC,
/24VDC only
/EIN/, /EAO/,
or /EDO/
(option)
only
/230
It is recommended that the installation should comply
with the local electrical safety installation practices (e.g.
HSE Memorandum of Guidance on Electricity at Work
Regulations 1989, USA National Electric Code).
Mounting Requirements
2
a
b
IQ251
e
IQ251
!
IQ251
Controller
PART/LA102359K
(option)
IQ251
Installation Instructions,
TG103483
IQ251
IQ251
The unit must be installed
in an enclosure rated to
IP20 or equivalent.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IQ251 and is the answer not in the manual?

Questions and answers

Summary of Contents for TREND IQ251

  • Page 1: Table Of Contents

    175 mm (6.9”) IQ251 IQ251 +45 °C 0 °C (113 °F) (32 °F) IQ251 The unit must be installed 0 %RH 90 %RH in an enclosure rated to IP20 or equivalent. altitude: <2000m (6562 ft) IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 2: 3.1 Installation - Mounting

    Insert lower screws No 12 wood screws M6 screws and nuts M6 screws IQ251 IQ251 IQ251 Fit earthing (grounding) bars Route Cables If PART/LA102359K available earthing (grounding) bar positions of earthing (grounding) bars IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 3: Iq251 Installation Instructions Tg103483 Issue 4, 09-May

    8 Analog + 8 Digital input channels /EAO/ 8 Analog output channels /EDO/ 8 Digital (relay) output channels slot tongue Replace side plates Terminate screens If earthing (grounding) bar fitted M4 (supplied) IQ251 eyelets maximum earthing (grounding) bars IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 4: 3.1 Installation - Mounting

    S R M V Earthing 2 S R M (grounding) bar 2 R M (RLM/HLM) WaRnIng: The wires connected 3 R M (HCM/TCM) hazardous voltages. Disconnect power before attempting any wiring. 6 R M IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 5: Installation

    Contact ratings: To meet safety requirements, for the 8 relays (DO1 to DO8) on IQ251, those being used must all be switching either low voltage 7 A @ 240 Vac (resistive); or mains and not a mixture of low voltage and mains. If switching 5 A @ 240 Vac (cosø>=0.4);...
  • Page 6: Installation - Mounting

    6  4 6  4 Connect auxiliary output supply Terminal size 0.5 to 2.5 mm (20 to 14 AWG) Auxiliary output supply socket 24 Vdc e.g. IQ251 IQ251 Imax = 500 mA IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 7: 3.2 Installation - Configuration

    Address = 2 + 16 = 18 = 19k2 baud Address = 9k6 baud IQ251 NOT SET = 1k2 baud address 1, 4 to 9, 11 to 119 0, 2 ,3 ,10 or >119 Baud Rate IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 8 D O 6 D O 7 D O 8 N o N c N o N c /EDO/ module Warning: These terminals may connected hazardous voltages. set link appropriately Normally set to Auto ( IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 9 . Check N E T W O R K O U T network cabling for short circuits with a multimeter (NOT Megger) Power up other nodes until faulty node is found (LAN Correct fault. IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 10 A O 8 O U T C O U T C O U T C O U T C O U T C O U T C O U T C O U T C IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 11 D O 7 D O 8 Backup SET Manual TE200147 IQ251 IQ251 (compare) X.IQ2 IQ251 ) , , 4 - 5 5 9 Way ‘D type’ SUPERVISOR Female RJ11 CABLE/EJ101442 Close panel IQ251 IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 12: Mounting In An Enclosure, Encls

    IQ251 Data Sheet TA102315 PowerTool sUpervisor port addr = 1,4 to 9, 11 to 119 9 Way ‘D type’ Female ) , , 4 - 5 5 sUpervisor port addr = 0 RJ11 SUPERVISOR IQ251 CABLE/EJ101442 IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 13: Replacing The Battery

    CaUTIon: This unit contains static sensitive devices. Suitable anti-static precautions should be taken throughout this operation Remove 4 screws to prevent damage to the unit. BSEN100015/1 Basic Specification: protection of electrostatic sensitive devices. IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 14 SET Manual TE200147 IQ251 X.IQ2 IQ251 ) , , 4 - 5 5 RJ11 sUpeRVIsoR Also set time, day, date. CABLE/EJ101442 9 Way ‘D type’ Female Close panel Reconnect power to I/o IQ251 IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 15: Zero Address/Baud Rate Switch Reset

    1, 4 to 9, 11 to 119 = 1k2 baud 0, 2 ,3 ,10 or >119 Download strategy, Close panel, Reconnect power to I/o Complete ‘Replacing the Battery’ (section 6, steps 14 to 16). IQ251 Installation Instructions TG103483 Issue 4, 09-May-2012...
  • Page 16: Replacing The Fuse

    Division of Honeywell Technologies Sàrl, Z.A. La Pièce, 16, 1180 Rolle, Switzerland by its Authorized Representative, Trend Control Systems Limited. Trend Control Systems Limited reserves the right to revise this publication from time to time and make changes to the content hereof without obligation to notify any person of such revisions or changes.

Table of Contents