Schmalz Jumbo Ergo Operating Instructions Manual page 29

Vacuum tube lifter
Table of Contents

Advertisement

9. J
E
/S
UMBO
RGO
PRINT
Attach the tube lifter with shackle and rotary
union to the carrier unit and secure it with the
retaining split pin.
10. Connect supply hose to the rotary union
connection tube and secure using hose
clamp.
WARNING
ATTENTION
When routing the supply hose along a crane column, ceiling, wall or floor, note that
the vacuum hose can contract by up to 15% when the vacuum is applied. It must
therefore be laid loosely with length compensation. Longer, straight line stretches
can also be bridged with plastic pipes. The total length should not exceed 50 m.
Long supply hoses reduce the carrying capacity and the dynamics of the tube lifter.
30.30.01.00173/04
200 to 300:
Risk of load breaking off due to incorrect mounting
Falling parts could hit people in the vicinity, causing death or serious injury!
The vacuum tube lifter Jumbo must be attached to the suspension eye of the
rotary union!
J
Ensure that the
UMBO
the included shackle.
Damage to the supply hose or compressed air hose due to
incorrect mounting
Hose lines become damaged eventually resulting in system failure.
The supply hose or compressed air hose must hang freely. It must not
touch, rub against or get caught up in other parts, or it can prematurely
wear or tear.
When attaching the hose lines, make sure they remain in a coil (ø at
least 500 mm).
www.schmalz.com
E
/S
200 to 300 models
RGO
PRINT
INSTALLATION
are attached using
EN | 29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jumbo sprint

Table of Contents