INSTALLATION

PACKAGE CONTENTS

The WaterMaster® 25 - 35 - 45 - 70 - 85 - 120 water heaters are delivered assembled and packaged.
At product reception and after removal of packaging, check the package contents and that
the appliance is free of damages.
Contents
WaterMaster water heater
Installation, Operation and Maintenance Instructions
Orifice for the natural gas to propane conversion + sticker
Ball condensate trap to be installed.
Safety valve kit to be installed, comprised of:
A primary safety valve Ø 1/2" F

TOOLS REQUIRED FOR THE INSTALLATION

WATER HEATER PREPARATION

Before placing the water heater in its final position, install:
Close the circulation tube end tap (1) (access
from the bottom of the appliance)
1
Install the ball condensate trap, then the
base front panel (to be clipped in)
Fit the condensate trap, complete with the ball, making sure to install the items in the correct
sequence and connect the hose to the drain using a connection that can be inspected. Fill the
trap with clean water. Make sure to prevent any risk of the condensates freezing.
WaterMaster 25 - 35 - 45 - 70 - 85 - 120 : A1006482 - 664Y7300 • D
GAS
pressure
(mbar)
The circulation tube is equipped with
an end tap that is open when the
appliance is delivered (to prevent test
water from being stuck in the circuit
and freezing during transport). Make
sure that you close the tap before
filling the system with water.