© Martin Engineering GmbH
1. Deactivate the conveyor system and all accessories before
starting the installation work and secure them against
inadvertent reactivation.
NOTE
The secondary cleaner should ideally be installed near a head
pulley or a counter-pressure roller. The clearance should be
between 50 and 100 mm.
Installation SQ2, 41605, 41641
Fig. 4:
Item
A
Centre point of the driving drum
B
Perpendicular on the lower conveyor belt level
C
Exit point of the conveyor belt from the driving drum
D
Running direction of the conveyor belt
E
Position of the belt cleaner's blade tip
F
See dimensions in Table 3
G
Installation holes in the tensioner
Tab. 2: Determination and creation of the installation position
A
B
50 min
C
100 max
91
F
114
G
Description
14
D
E
M3682UK-09/17