Cisco 7513 Hardware Installation And Maintenance Manual page 134

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Ethernet Connections
Fast
For
an
network
On
connection
connection
Note
and MIT
you have RJ-45
If
FEIP See
FEIP
the
application
Figure
To
transceiver
repeater
To
repeate
or
Attach
switch
Caution
MIT
cables
connection
100BASE-T
MIT
connection
The RJ-45
connection
does
100BASE-T
single
port adapter
100BASE-T
you have two
If
on one and
MIT
the
connection
Do
not simultaneously
connect
cables
not available
are
attach the Category
connections
you have MIT
3-9
Figure
If
100BASE-T
or
attach
MIT
the
on
to
the
port
Connections
3-9
Fast
Ethernet
DTE
or
Mu
cable
DTE
RJ-45
cable
network
end
your RJ-45
the
of
DTE
hub
whatever
or
repeater
To
problems on
prevent
100BASE-T
one
to
port adapter
be used
one time Only
can
at
MAU
transceiver
or
not require
an external
can
use
either the
you
on
port adapters
your
on
the other
MIT and RJ-45
cables
from
Cisco
Systems
UTP
cable
attach an
connections
100BASE-F
or
transceiver
FEW
Top
port adapter
Bottom
port
100BASE-T
Mil
or
cable
to
your
100BASE-T
external
FEIP and network
do
your
On
100BASE-T
single
connect
cables
that
Connecting
be
should
connected
already
transceiver
RJ-45
connection
or the
MIT
FEIP
you can
use the
RJ-45
100BASE-T
one
to
port adapter
RJ-45
the
to
port
directly
MIT
cable
the
to
directly
media
with
the
appropriate
adapter
100BASE-F
or
have
equipment
you
not simultaneously
connect
one network
port adapter
only
with
ETA/TIA-588
comply
Installing
Cables
Interface
your
to
RJ-45
on
the
MIT
on
port
to
your
transceiver
RJ-45 and
standards
the Router
3-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents