Cisco 7513 Hardware Installation And Maintenance Manual page 83

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Site
Requirements
Power
Follow
Check
you
Provide
For AC-input
Install
For
Table
The AC-input-powered
20-amp
plug
Figure
IEC 320
to
Note
The
that
shows
Figure
End
39
7513
Hardware
2-18
Cisco
and recommendations
these
precautions
the
at
site
power
your
clean
are receiving
power
redundant
sources
power
installations
grounding
to
proper
AC-input and DC-input
both
1-1
chassis operating
power source The power
the
at
receptacle
shows
2-2
cable
features
Figure
AC
Power
2-2
20-Amp
connector
20-amp
AC
the
supply
power
20A
codes
Wiring
prevent
DC
powered
chassis requires
AWG
you
use an
highly
the conductor
preparation
DC Power
2-3
Cable
.925
Maximum
View
conductor
210
.140
and
Maintenance
Installation
when
planning
and
before
installation
periodically
conditioner
Install
power
for each
power
supply
install
an uninterruptible
power
from
avoid
damage
lightning
observe
installations
2OVAC
at
requires
cable
supplied
connect
to
required
Cable Connector
and
20-amp
plug
from
used
with
plugs
being
minimum 35A
dedicated
flexible stranded
cable
for the
for the
cable
connections
DC-input
Connection
to
Terminal
.83
measurements
All
exposed
surface
Crimp
area
connections
to
power
after
installation
if
necessary
the chassis
installed
in
where
source
possible
and power
surges
the
listed
power
specifications
minimum
of
service
20-amp
with
the chassis uses
AC
the
to
20-amp
your
plug
Plug and
20-Amp
Receptacle
20-amp
most equipment
rack
power
48VDC
We
service
at
DC
connections
power
Block
inches
in
AWG
conductor
the router
ensure
to
that
in
with
20-amp
source
receptacle
strips
recommend
2-3
Figure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents