Cisco 7513 Hardware Installation And Maintenance Manual page 103

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Network
Connections
Preparing
Optical
normal
uninterrupted
onto
the ring before
Figure
the
on
switch
fails the
Figure
The
bypass
and
sends
without
when
allow
just
neighbor
Another
concentrators
primary
7513
Hardware
2-38
Cisco
switches
avoid
bypass
segmentation
operation
an
optical bypass
When
with
station
reaches
the
it
shows
2-26
an optical bypass
Station
is
left
functioning
allows
the
essentially
signals
switch
enables
bypass
optical
Operation on
2-26
Bypass
Optical
Station
Station
switch
reroutes
the
light
back
out to the ring
This
it
back
However
wrapping
on
itself
back
out
the ring
to
sending
it
the signal to pass through
next
the
station
on
the
ring
for
tolerance
fault
technique
the designated
Only
does
the
backup
passive
fail
and
Installation
Maintenance
failed
by
eliminating
switch
allows
the
signal
light
switch
fails the bypass
bypass
so the ring does
failed
station
switch
Station
installed
at
so the
normally
bypass
optical
without
to
pass through
it
the
bypassed
configuration
DAS
before
signal
by
intercepting
it
allows
the signal
maintain
to
stations
that
are operating
do
switches
Optical
bypass
them
loss
so
signal
significant
is far
away
dual
is
homing
whereby
concentrator
active unless
primary
is
concentrator
activated
is
from
the ring
stations
During
to
itself
pass
through
directly
switch reroutes
the signal
have
wrap back on
not
to
itself
normal
In the
configuration
switch
transparent
appears
However
if
Station
interruption
shown
on
the
in
Figure
right
station
Optical
bypassed
Station
reaches
the
Station
failed
it
and
direction
its
existing path
repeat the signal
normally
not repeat or drive
the signal
when
downstream
can
occur
the
devices
are attached
critical
to
or
link
fails
it
its
and
the ring
sustains
automatically
back
shown
The
2-26
switch
bypass
configuration
they
two
the
If

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents