Cisco 7513 Hardware Installation And Maintenance Manual page 132

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Attach
the
CAB-ATM-DS3IE3
Step
PLIM
E3
See
the
Figure
One
of the cable
portion
receive-to-transmit
ATM
PLIM
and
your
between
attach
receive
ATM
switch
your
respectively
EMI
Hold
Step
the
filter clip
3-7c
in
Figure
To
the
ensure
that
Step
clip
the
position
clip
parallel
3-7
the
Figure
Installing
RX
To
switch
of
White
insulator
TX
To
switch
of
cable
the transmit
to
3-7a
has
white
insulator
on
and
transmit-to-receive
relationship
The
switch
of the cable
portion
and
transmit
or transmit
ports
shown
and
in
3-7b
as
Figure
when
is
not pulled
off
adjacent
AlP See
the orientation
of the
to
CAB-ATM-DS3/E3
Cable and
White
insulator
filter
clip
Connecting
XMTR
RCVR
and
receive
both
ends
ensure
the
to
that
is
between
maintained
with
the white
insulators
and
E3
receive ports of the
attach
the receive
cable
to
it
interface
processors
are
Figure
3-7d
EMI
Assembly
Filter
Clip
Installing
Cables
Interlace
on
ports
B3
the
should
PLIM
and
shown
as
removed
the Router
3-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents