Cisco 7513 Hardware Installation And Maintenance Manual page 124

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

Caution
grasping
Figure
Figure
General
Installation
The
router
should
Preparing
When
chassis
The
cooling
Multiple
clearance
Do
chassis
conditions
environment
When
approximately
blower
To
damage
the
to
prevent
one hand
the handle
with
3-2 The
intake
air
vent
is
not designed
Way
3-2
Incorrect
to
be
should
the area
in
already
be determined
not
already
if
for Installation
the router
on
installing
tabletop
and have
considered
the
following
location
does
not block
the chassis front
allow
air
are located
at least
be
chassis can
installed
not place
the router
on
the floor Floors
the
fans
interior
by
Excessive
and component
failures
than
the floor
where
any equipment
deciding
to install
19
inches
behind
module
power
supplies
below
air
intake
vent
the card
and
bottom
the
of the card
cage
the weight
to
support
Cisco 7513
the
Lift
where you
will
install
it
refer
the section
Site Requirements
to
you have
ensure
that
planned
and
where
rear
inches
of clearance
six
in
equipment
racks
with
only
accumulate
dust
dust inside the chassis
raised platform
or sturdy
consider future
the chassis for
or replacing
installing
network
or
making/adding
General
do
the chassis
not
cage
lift
shown
with the other
as
of the chassis
and your
location
installation
the chapter
in
clean
safe location
and
the exhaust
intake
vents
an inch
more
of
or
vertical
which
would be drawn
into
interior
can
cause
overtemperature
cleaner
table
provides
maintenance
requirements
modules
processor
connection
cables
or
equipment
Installing
Installation
by
in
for the
for
the
Allow
the
the Router
3-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents