8.11 Definition of fuses

Power of
transformer
kVA
100
125
160
200
250
315
400
500
630
800
1000
1250
1600
2000
(*) The fuse definition must consider the power loss limits (indicated in the fuse documentation)
–5ºC  T 
(**)To (IN a:
of service 1.2 x IS.

9. START-UP

9.1 Essential checking

Confirm the proper connection of the busbar, cable, earth circuits, measuring TF's
and auxiliary LV circuits;
Confirm the proper assembly of the fuses, busbar and cable field deflectors and
cable compartment panels;
Confirm that the pressure indicator (if applicable) is in the green zone

9.2 Switchgear operations

Confirm the proper functioning of the equipment and of the interlocking, by
operating the Switch and the Earthing Switch.

9.3 Voltage feeding

Confirm that all devices are in "open" position.
Transformer - primary voltage
10/11 kV
13.8 kV
Rated current (A) I
16
10
16
16
20
16
25
20
31.5
25
40
31.5
50
40
63
50
80
63
100
80
125
100
160
125
160
(*)
250
(*)
+40ºC) and power transformer > 1000 kVA, the maximum intensity
20
15kV
20kV
24/25 kV
(**)
N
10
10
10
10
16
16
16
16
20
16
25
20
31.5
25
40
31.5
31.5
50
40
63
50
80
63
100
80
125
100
(*)
(*)
NORMAFIX
30 kV
10
10
10
10
10
10
16
10
16
10
20
16
25
16
20
40
25
50
31,5
63
40
80
50
(*)
(*)
(*)
(*)

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NORMAFIX and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF