Promeba PC-615 User Manual page 9

Incubator stretcher
Table of Contents

Advertisement

USER MANUAL //
STRETCHER PC-615
Review 11/18
02
INSTALATION
02.1
Transporting and unpacking
First remove the packaging carefully to prevent dama-
ge to the exterior of the stretcher.
1. Transporting
· Always fix the load, if piling up is necessary always
follow the scheme shown.
· Transport the leveled load and following all precepts
and rules for the transport of loads.
2. Unpacking
· Place the box on a flat, stable surface and open the
seal being careful not to damage the inside.
· Remove the stretcher from the inside of the load as
shown in the scheme below.
Each stretcher has been minutely examined when lea-
ving the factory. To ensure that it has not been dete-
riorated during transport, please carefully inspect the
outside and the inside, and in case of finding any im-
perfection, immediately contact the installer.
For an optimum operation, the stretcher must be leve-
led.
PACKING UNIT
RRESPECT THE PACKING'S TRANSPORT POSITION
PRODUCT'S UNPACKING
ALWAYS USE A FLAT BASE SUPPORT
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents