Preparing The System For Operation - IBM Power Systems RDX Manual

Power cable, and removable disk drives for the 9009-41a, 9009-42a, or 9223-42h
Hide thumbs Also See for Power Systems RDX:
Table of Contents

Advertisement

Figure 19. Locking the front door
Preparing the system for operation after installing an internal RDX docking station in the
9009-41A, 9009-42A, or 9223-42H
To prepare the system for operation after installing an internal RDX docking station, complete the steps in
this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 20 on page 24.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
RDX docking stations, removable disk drives, and power cable, for the 9009-41A, 9009-42A, or 9223-42H 23

Advertisement

Table of Contents
loading

Table of Contents