Checks Before Starting Up; Starting Up - ACV Smart ME 200 Installation, Operation And Maintenance Instructions, For The User And The Installer

Table of Contents

Advertisement

EN

STARTING UP

CHECKS BEFORE STARTING UP

• Check that the safety valves (DHW and primary) are correctly installed and that the outlets are
FR
connected to the sewer.
• Check that the DHW tank and the primary circuit are filled with water.
• Check that the air has been correctly bled from both circuits.
• Check that the tank's upper air bleed valve is tight.
NL
• Check that the water side and heat source side pipes are correctly connected and not leaking.
ES
STARTING UP
STARTING UP
To put the installation into service, refer to the heating boiler manual.
If the tank is used as electric DHW tank only:
IT
1.
Put the electric plug into the mains socket
2.
Adjust the required temperature using the control thermostat integrated in the electrical
resistance.
If the tank is used within a heating installation:
DE
To put the installation into service, refer to the heating boiler manual.
1.
Adjust the required temperature using the control thermostat of the tank.
(Smart ME 600 - 800 : Control thermostat is not provided in standard appliance).
PL
RU
en
38
Smart ME : A1003499 - 661Y2000 • C

Advertisement

Table of Contents
loading

Table of Contents