INSTALLATION

SAFETY INSTRUCTIONS

FR
General remarks
Connections (electrical, hydraulic) must be carried out in accordance with
applicable standards and regulations.
NL
If the water drawing off point is far from the tank, installing an auxiliary DHW loop
can allow to get hot water more quickly at all times.
Essential instructions for the correct operation of the system
ES
The tank must be installed in a dry and protected area.
Install the appliance to ensure easy access at all times.
To avoid any risk of corrosion, connect the stainless steel tank directly to the earth.
IT
Make sure to install a pressure reducing valve set at 4.5 bar in the DHW circuit if the
supply pressure is higher than 6 bar.
On the DHW circuit, install an approved safety group, comprised of a safety valve
set at 7 bar, a check valve and a stop valve.
DE
Make sure that the outlet of the safety unit goes directly to the sewer to avoid any
potential damage.
Do not install the safety group above the tank to avoid water discharge on to the
tank.
PL
Make sure to install a domestic expansion vessel of the appropriate size to avoid
discharge from the safety valve (loss of water). Refer to the expansion vessel
manufacturer's technical instructions for more details.