Start-Up Procedure; Normal Mode; Cold Start - LEGRAND DAKER DK Plus Series Installation Manual

1 kva-2 kva-3 kva
Hide thumbs Also See for DAKER DK Plus Series:
Table of Contents

Advertisement

Available languages

Available languages

4.3

Start-up procedure

4.3.1 Normal mode

1. Make sure the input thermal breaker is not tripped. If it is, reset it.
2. Plug the UPS input cable into the mains socket.
3. The UPS turns to the standby mode in 5 seconds. The green LED
voltage is within the admittable range and the fans spin. The battery charger is active. In this
condition the loads are not powered. The display looks like the following figure:
4. Press the ON key
The green LEDs
5. The start-up procedure is completed. Make sure that the batteries are fully charged or that the
UPS has been plugged to the wall receptacle at least for 4 hours before connecting the loads.

4.3.2 Cold start

1. Make sure the internal batteries or the external battery cabinets are connected to the UPS.
2. Press the ON key
play looks like the following figure:
3. Press the ON key
mation is not completed within 10 seconds, the UPS does not perform the cold start and shuts
off.
48
and hold it until the buzzer sounds twice.
light up. The display looks like the following figure:
and hold it until the buzzer sounds twice. Then release the key. The dis-
again and hold it until the buzzer sounds twice. If the second key confir-
4 Operation
lights up if the input

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents