EMS FireCell Verification Manual page 2

Survey kit
Hide thumbs Also See for FireCell:

Advertisement

Introduction
The procedure described in this document is a veri cation of performance and not a
calibration. Calibration requires complex equipment to conduct measurements which due
to the nature of the site survey equipment is not required. The veri cation will con rm
continued performance of the survey kit such that it is suitable for continued use without the
cost of formal calibration.
There are two sections outlined within this document:
Section 1 - General maintenance (pages 3 to 4)
Section 2 - Two yearly maintenance (pages 5 to 6)
If you encounter issues completing the steps outlined in this document, please contact EMS
technical support.
Kit familiarisation
SURVEYOR
DEVICE
LOCAL - REMOTE
PASS / FAIL
REMOTE - LOCAL
SIGNAL QUALITY %
BATTERY
Pole Mounted
Survey Tool
Speci ed batteries
When replacing batteries; observe correct polarity, using only speci ed batteries shown
below.
Signal Surveyor:
Pole Mounted Survey Tool:
Note: Fitting of an incorrect battery type invalidates the product certi cation and may result
in poor performance.
CH 1
CH 2
CH 1
CH 2
POWER/
CHARGE
RSSI/dB
TX
START
RX
LOCAL - REMOTE
REMOTE - LOCAL
Signal Surveyor
1 x 6V 4Ah Lead Acid battery
(Yuasa NP4-6)
4x AA Alkaline batteries
(Panasonic LR6AD Powerline / Varta 4006 Industrial)
Page 2 of 8
Device survey
rods
12 VOLT
BATTERY
CHARGER
Signal Surveyor
mains charger