Installation Of Pipelines - Parker Zander WVM 40 Operating Manual

Adsorption dryer
Table of Contents

Advertisement

EN | Operating manual

Installation of pipelines

To ensure proper operation of the dryer, its connection to the compressed air system must be
free from stress.
Prior to installation, check all incoming and outgoing compressed air lines and valves for
damage or contamination.
Inspect screw connections and retighten, if necessary (screw connections might become
loose during transport).
Ensure that the pipelines are not under any stress when installed!
Stress on pipes might result in the rupturing of the lines during operation, re-
sulting in damage to persons and property.
Connect the dryer to the compressed air system, while heeding rated diameter and
pressure.
The fi gure below shows a proper installation.
Compressed air system
The connecting lines of the preliminary fi lter (4) should be at a slight slope towards the
fi lter.
A shut-off valve (3, 10) at both the inlet and outlet for the compressed air must be in-
stalled.
In units with bypass line (5) and additional shut-off valve:
Ensure that the line is installed in such a way that the compressed air fl ow must not be inter-
rupted during maintenance of the dryer.
28
Example of a proper installation with bypass line
Item Component
1
Dryer
2
Humid air inlet
3
Compressed air inlet valve
4
Preliminary fi lter
5
Bypass line
6
Valve in bypass line
7
Bypass fi lter
Valve at outlet of bypass
8
fi lter
9
Afterfi lter
Compressed air outlet
10
valve
11
Dry air outlet
WVM 40 -1450