Download Print this page
Assa Abloy Sargent 10G13 Installation Instructions
Assa Abloy Sargent 10G13 Installation Instructions

Assa Abloy Sargent 10G13 Installation Instructions

Advertisement

Quick Links

Tools
#2 Phillips screwdriver
Push pin (provided)
7/16" drill bit
1/8" drill bit
2-1/8" bore
1" bore
2
1
Parts
1. Inside lever
2. Scalp (2)
3. Screws – mounting plate
(2) #6 x 3/4" self-tapping
4. Spacer bushing (2)
* Used with 68 Function only

Door Preparation

• All doors should be properly reinforced for lock support. If support is not provided, contact door manufacturer.
• For all metal door preparations use template A4375, EXCEPT for functions 10G70 or 10G71 which uses template 4409
(provided), or functions 10U93, 10U94 and 10U94-2 which require template A4375.
• For all wood door preparations use template A6719, EXCEPT for functions 10G70 & 10G71 which uses template 4409
(provided), or functions 10U93, 10U94 and 10U94-2 which requires template A4375.
• Template information is available on our website, www@sargentlock.com.
• Mark and Drill Holes
IMPORTANT:
Fold template onto high
edge of door bevel
Backset
must match lock
(2-3/8" or 2-3/4")
38" from
Finished Floor
DOOR
5
6
4
3
Inside of Door
5. Inside rose assembly
6. Screws – through-bolt
(2) #10-32 x 1-1/4"
7. Lockbody
8. Outside rose assembly
9. Cylinder spacer
1"
(25mm)
hole
Template
2-1/4"
(57mm)
Door
Bevel
FRAME
INSTALLATION INSTRUCTIONS FOR
10 Line Lever Lock
For installation assistance, contact SARGENT at 800-727-5477
www.sargentlock.com
8
7
Outside of Door
1 4
15
16
1 7
• Final Door Prep
7/16" (11mm) hole
5/32"
(4mm)
1-1/8"
(29mm)
IMPORTANT: Deadlocking latch must
stop on strike when door is closed
(Patents Pending)
2
9
4
1 0
(secured side)
10. Cylinder
11. Outside lever
12. Key
13. Push pin
14. Latch
15. Screws – latch & strike
(4) #8-32 x 3/4"
16. Strike
17. Strike box
• Frame Prep for Strike
Centerline of
latch front and
strike
2-1/8"
Screws (2)
(54mm)
#8-32 x 3/4"
hole
© SARGENT Manufacturing Company
1 2
1 1
1 3
Strike
1
A7133J

Advertisement

loading
Need help?

Need help?

Do you have a question about the Sargent 10G13 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Assa Abloy Sargent 10G13

  • Page 1: Door Preparation

    INSTALLATION INSTRUCTIONS FOR 10 Line Lever Lock (Patents Pending) For installation assistance, contact SARGENT at 800-727-5477 www.sargentlock.com Tools #2 Phillips screwdriver Push pin (provided) 7/16” drill bit 1/8” drill bit 2-1/8” bore 1” bore Outside of Door (secured side) 10. Cylinder 11.
  • Page 2 Latch Installation Preset Lock • Through-bolt Location – 12 and 6 o’clock Install loosely; Preset thrubolt locations – Preset thrubolt locations – tighten after step #3 • Door Thickness – 1-3/4” thick Outside Outside for different locations see for different locations see of Door of Door Screws (2)
  • Page 3 Lever and Cylinder Removal Interchangeable and Removable Core Cylinder Standard Cylinder • Remove cylinder and tailpiece, using control key (stamped “C”) • Insert Phillips #2 screw driver into cylinder opening making contact with lever retainer. • Pull lever retainer horizontally towards Control key door hinge and remove lever.
  • Page 4 Remove 10G13 • Remove inside (non-rigid) lever with standard push pin • Insert long push pin into inside lockbody tube and push to release spring loaded lever catch plug assembly for the outside lever • Remove the outside lever with lever catch plug assembly attached Install 10G70 &...

This manual is also suitable for:

Sargent 10g70Sargent 10u94Sargent 10g71Sargent 10u93Sargent 10u94-2Sargent 10g30 ... Show all