Advertisement

CE DECLARATION OF CONFORMITY .......................................................................................................................... 2
WARNINGS FOR THE INSTALLER ................................................................................................................................. 2
1 WARNINGS ............................................................................................................................................................ 3
2 TECHNICAL SPECIFICATIONS ................................................................................................................................. 3
3 LAYOUT AND COMPONENTS .................................................................................................................................. 3
4 ELECTRIC CONNECTIONS ...................................................................................................................................... 3
4.1
4.2 TERMINAL BOARD - POWER SUPPLY (FIG. 2) ..................................................................................................... 6
4.3 J6 TERMINAL BOARD - MOTORS AND FLASHING LAMP (FIG. 2) ........................................................................ 6
4.4 J1 TERMINAL BOARD - ACCESSORIES (FIG. 2) .................................................................................................. 6
4.5 CONNECTOR J2 - RAPID CONNECTION TO MINIDEC, DECODER AND RP ......................................................... 7
4.6 CONNECTION OF OPERATOR 844 .................................................................................................................... 7
4.7 CONNECTION OF OPERATOR 541 .................................................................................................................... 7
4.8 CONNECTION OF OPERATORS WITHOUT ON-BOARD INTERFACE....................................................................... 7
5 PROGRAMMING .................................................................................................................................................... 9
5.1 BASIC PROGRAMMING .................................................................................................................................... 9
5.2 ADVANCED PROGRAMMING ............................................................................................................................ 9
6 START-UP ................................................................................................................................................................ 11
6.1 INPUTS CHECK .................................................................................................................................................. 11
6.2 INSTALLATION USING SLIDING GATE OPERATORS .............................................................................................. 11
6.3 INSTALLATION USING THE 541 OPERATOR ......................................................................................................... 12
6.4 INSTALLATION WITH THREE-PHASE OPERATOR ( ES: 541 3PH ) ................................................................................12
7 FINAL OPERATIONS ................................................................................................................................................ 12
INDEX
.......................................................................................... 4


Advertisement

Table of Contents
loading

Summary of Contents for FAAC 578D

  • Page 1: Table Of Contents

    INDEX CE DECLARATION OF CONFORMITY .......................... 2 WARNINGS FOR THE INSTALLER ..........................2 1 WARNINGS ................................3 2 TECHNICAL SPECIFICATIONS ..........................3 3 LAYOUT AND COMPONENTS ..........................3 4 ELECTRIC CONNECTIONS ............................3 ..................4 CONNECTION OF PHOTOCELLS AND SAFETY DEVICES 4.2 TERMINAL BOARD - POWER SUPPLY (FIG.
  • Page 2: Ce Declaration Of Conformity

    12604 and EN 12605. prevent the automated system from being activated involuntarily. For non-EU countries, to obtain an adequate level of safety, the Standards mentioned above must be observed, in addition to national 23) Transit is permitted only when the automated system is idle. legal regulations. 24) The user must not attempt any kind of repair or direct action whatever 9) FAAC is not responsible for failure to observe Good Technique in and contact qualified personnel only. the construction of the closing elements to be motorised, or for any 25) Maintenance: check at least every 6 months the efficiency of the system, deformation that may occur during use. particularly the efficiency of the safety devices (including, where foreseen, 10) The installation must conform to Standards EN 12453 and EN 12445. the operator thrust force) and of the release devices.
  • Page 3: Warnings

    CONTROL BOARD 578D 1 WARNINGS 3 LAYOUT AND COMPONENTS Important: Before attempting any work on the control board (connections, maintenance), always turn off power. - Install, upstream of the system, a differential thermal breaker with adequate tripping threshold. - Connect the earth cable to the appropriate terminal on the J7 connector of the equipment (see fig.).
  • Page 4: Connection Of Photocells And Safety Devices

    NOTE: The 578D equipment is able to command electro-mechanical Connection of no safety device operators for sliding gates and industrial sectional doors. Anything referring to gates in these instructions also applies to doors. Any differences are shown in the specific paragraphs.
  • Page 5 Connection of a pair of opening photocells, a pair of closing Connection of a pair of closing photocells, a pair of opening photocell and an edge safety device photocells and a pair of opening/closing photocells Fig. 0 Connection of two pairs of closing photocells and two edge safety devices Fig.
  • Page 6: Terminal Board - Power Supply (Fig. 2)

    STOP - STOP contact (terminal 5): any device (e.g. a 4.2 Terminal board - Power supply (fig. 2) push-button) which, by opening a contact, stops gate POWER SUPPLY (terminals PE-N-L): movement. PE : Earth connection To install several STOP devices, connect the N.C. N : Power supply ( Neutral ) contacts in series (fig. 4).
  • Page 7: Connector J2 - Rapid Connection To Minidec, Decoder And Rp

    4.5 Connector J2 - Rapid connection to Minidec, Decoder and RP This is used for rapid connection of Minidec, Decoder and RP receivers (see fig. 15, 16 and 17). Connect the accessory, with the components side facing the inside of the board. Fig. 5 Insert and remove after cutting power. 4.6 Connection of operator 844 Make the connections between the 578D equipment and the inter-connection board mounted on the operator, observing the diagram in fig.18. Refer to paragraph 6.2 PLUS for instructions on putting into operation. DECODER 4.7 Connection of operator 541 Make the connections between the 578D equipment and the inter-connection board mounted on the operator, observing the diagram in fig.19.
  • Page 8 Fig. 9 Fig. 0 Fig. ...
  • Page 9: Programming

    5 PROGRAMMING 5.2 ADVANCED PROGRAMMING To program operation of the automated system, you have To access ADVANCED PROGRAMMING, press key F and, as to access the "PROGRAMMING" mode. you hold it down, press key Programming is split into two parts: BASIC and ADVANCED. •if you release key + , the display indicates the name of the first function. 5.1 BASIC PROGRAMMING •if you release key F too, the display shows the value of the To access BASIC PROGRAMMING, press key F: function that can be modified with keys + and -. •if you press it (and hold it down), the display shows the name •if you press key F (and hold it down), the display shows the of the first function. name of the next function, and if you release it, the value that •if you release the key, the display shows the value of the can be modified with keys + and - is shown. function that can be modified with keys + and -. •when you reach the last function, press F to exit the program, •if you press F again (and hold it down), the display shows the and the display resumes showing the gate status. name of the next function, etc. •when you reach the last function, press F to exit the program, The following table shows the sequence of functions and the display resumes showing the gate status.
  • Page 10 Display Function Default Display Function Default INDICATOR-LIGHT: ENCODER: is selected, the output functions as a If the encoder is used, you may select its presence. standard indicator-light (lighted at opening If the encoder is present and enabled, and pause, flashing at closing, and off when "decelerations"...
  • Page 11: Start-Up

    FC1 (LED OFF). = Active = Disabled 6.2 Installation using sliding gate operators When you have made the connections between the 578D equipment and the on-board operator interface CYCLE PROGRAMMING: board, and have fitted the travel-limit plates on the rack For setting countdown of system operation (see operator instructions), check opening direction and cycles.
  • Page 12: Installation Using The 541 Operator

    •Cut power to the system. •Release the operator and partially open the door. •Lock the operator, power up the system again and command opening. If the door begins its closing movement, change opening direction (see Par.5.1). After you have changed it, return to viewing automated system status, and then power down and power up the equipment. NOTE - For perfect installation of the 578D equipment, using sectional doors operator 541, take care over the following aspects: OPERATING LOGIC ( LO ) : If you wish to control the operator 541 by using an UP and DOWN push-button, you have to use the following logics: B , C , B/C . (REFER TO THE TABLES OF THE LOGICS) DECELERATION BEFORE ( rP ) AND AFTER TRAVEL-STOP (rA ) :...

Table of Contents