2.1 MECHANICAL
2 INSTALLATION
Remove the relay from the case during mounting (see the following section). Slide the case into the cutout from the front of
the panel as shown below. While firmly applying pressure from the front of the chassis to ensure the front bezel fits snugly,
bend out the retaining tabs as shown below.
2
Figure 2–3: SLIDING THE UNIT INTO THE PANEL
Figure 2–4: BEND UP MOUNTING TABS
The retaining tabs will be sufficient to hold the chassis securely in place. If additional fastening is desired the SR optional
mounting kit can be ordered. This kit provides additional support with adjustable mounting brackets. The captive chassis
should now be securely mounted to the panel with no movement, ready for rear terminal wiring.