Garmin GTN 635 Installation Manual page 159

Hide thumbs Also See for GTN 635:
Table of Contents

Advertisement

NOTES:
1. ALL WIRES 24 AWG OR LARGER UNLESS OTHERWISE SPECIFIED.
2. GROUND DESIGNATIONS:
3. AT GTN 7XX, CONNECT SHIELD GROUNDS TO THE CONNECTOR BACKSHELL -- THE SHIELD LEADS MUST BE LESS THAN 3.0".
CONNECT OTHER SHIELD GROUNDS TO AIRCRAFT CHASSIS WITH AS SHORT A CONDUCTOR AS PRACTICAL.
4. THIS DIAGRAM PROVIDES AN OVERVIEW OF A TYPICAL GTN 7XX INSTALLATION. REFER TO APPROPRIATE INTERCONNECT
DIAGRAMS FOR SPECIFIC EQUIPMENT.
5. CONFIGURATION MODULE HARNESS USES 28 AWG WIRES. CONTACTS SUPPLIED WITH THE CONFIGURATION MODULE MUST
BE USED FOR CONNECTING CONFIGURATION MODULE HARNESS TO P1001.
6. AIRCRAFT POWER MUST BE 11-33 VDC.
GTN 625/635/650 TSO Installation Manual
190-01004-02
s
SHIELD BLOCK GROUND
Figure D-2. GTN 650 Typical Installation
Sheet 2 of 2
AIRFRAME GROUND
Page D-5
Rev. C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gtn 625Gtn 650

Table of Contents