7
Assembly and installation
7.1
Additional tools, aids and installation material
beyond the usual installation accessories the following is required:
• Data cable / patch cable (Cat. 5e minimum) CAN connection MyReserve and SwitchBox,
communication link SwitchBox and Fronius Symo Hybrid
• Laptop (for setting up the Fronius Symo Hybrid system monitoring)
• Socket for UPS
• Mounting material
7.2
Mounting the SwitchBox
•
Mount the SwitchBox to the wall with suitable fastening material
PAGE 22 | Version: 07/2019 | Rev. 000 | AZ-TM-PME-1693 | Subject to changes | © 2019 SOLARWATT GmbH
Need help?
Do you have a question about the MYRESERVE BACKUP POWER and is the answer not in the manual?