Cisco Catalyst 9404R Switch Hardware Installation Manual page 45

Hide thumbs Also See for Catalyst 9404R Switch:
Table of Contents

Advertisement

Preparing for Installation
Task No.
5
6
1
Verify that each power supply installed in the chassis has a dedicated AC source circuit.
2
Refer to the power supply'VA rating as a sizing criteria in determining the output required by the UPS.
The power supply kVA rating value is listed in the specifications table for each power supply in Appendix
A (power supply specifications).
Activity
Cable and interface equipment evaluation
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment (transceivers)
EMI evaluation
• Distance limitations for signaling
• Site wiring
• RFI levels
Cisco Catalyst 9400 Series Switches Hardware Installation Guide
Site Preparation Checklist
Verified
Time
Date
By
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 9400 seriesCatalyst 9407rCatalyst 9410r

Table of Contents