Sime ALU HE Series User, Installation And Servicing Instructions

Sime ALU HE Series User, Installation And Servicing Instructions

Aluminium condensation boiler
Hide thumbs Also See for ALU HE Series:
Table of Contents

Advertisement

Quick Links

Cod. 6316191 - 08/2013
Cod. 6316191 - 08/2013
6328465 - 09/2019 - R7
Cod. 6316191 - 08/2013
UK
UK
BRAVA DGT HE
BRAVA DGT HE
BRAVA DGT HE
Aluminium condensation boilers
25 - 30 - 35
ALU HE
25 - 30 - 35
25 - 30 - 35
INSTALLATION AND SERVICING INSTRUCTIONS
USER, INSTALLATION AND SERVICING INSTRUCTIONS
INSTALLATION AND SERVICING INSTRUCTIONS
ENSURE THAT THESE
ENSURE THAT THESE
ENSURE THAT THESE
INSTRUCTIONS ARE LEFT
INSTRUCTIONS ARE LEFT
INSTRUCTIONS ARE LEFT
FOR THE USER AFTER
FOR THE USER AFTER
FOR THE USER AFTER
COMPLETION OF THE
COMPLETION OF THE
COMPLETION OF THE
BENCHMARK SECTION
BENCHMARK SECTION
BENCHMARK SECTION
PLEASE READ THE
PLEASE READ THE
PLEASE READ THE
IMPORTANT NOTICE
IMPORTANT NOTICE
IMPORTANT NOTICE
WITHIN THIS GUIDE
WITHIN THIS GUIDE
WITHIN THIS GUIDE
REGARDING YOUR BOILER
REGARDING YOUR BOILER
REGARDING YOUR BOILER
WARRANTY
WARRANTY
WARRANTY
199838
199838
199838
199839
Authorised User No. 02285
BOILER DETAILS
please position here a sticker
from installation pack
TRANSLATION OF THE ORIGINAL INSTRUCTIONS

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ALU HE Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sime ALU HE Series

  • Page 1 Cod. 6316191 - 08/2013 Cod. 6316191 - 08/2013 6328465 - 09/2019 - R7 Cod. 6316191 - 08/2013 BRAVA DGT HE BRAVA DGT HE BRAVA DGT HE Aluminium condensation boilers 25 - 30 - 35 ALU HE 25 - 30 - 35 25 - 30 - 35 LLATION AND SERVICING INSTRUCTIONS INSTALLATION AND SERVICING INSTRUCTIONS...
  • Page 2 For the first year all of our appliances are protected by our manufacturer’s guarantee which covers both parts and labour. As you would expect from Sime Ltd, it is our aim to provide our valued customers with the best in after sales and service.
  • Page 4 The Benchmark Scheme Sime is a licensed member of the Benchmark Scheme which aims to improve the standards of installation and com- missioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety, efficiency and performance.
  • Page 5 – The appliance must be used as in- – This manual is an integral part of the tended. Sime declines all responsible appliance. It must therefore be kept for for any injury or damage to persons, future reference and must always ac-...
  • Page 6 RESTRICTIONS DO NOT DO NOT – To allow children under the age of 8 to – Do not block the condensate drain. use the appliance. The appliance can – Do not pull, detach or twist the electri- be used by children no younger than cal cables coming out of the appliance 8 years old, by people with physical even if the appliance is disconnected...
  • Page 7 RANGE MANUAL STRUCTURE This manual is organized as follows. MODEL CODE ALU HE 80 8115701 ALU HE 116 8115710 USER INSTRUCTIONS ALU HE 160 8115720 ALU HE 200 8115730 TABLE OF CONTENTS ALU HE 240 8115740 ALU HE 280 8115751 DESCRIPTION OF THE APPLIANCE COMPLIANCE TABLE OF CONTENTS...
  • Page 9: Table Of Contents

    2012/19/EU) ........13 Fault / malfunction codes......12 SIME remote control connection (optional accessory) 12 VERY IMPORTANT! PLEASE MAKE SURE YOUR COMMISSIONING CHECKLIST AND THE SERVICE INTERVAL RECORDS ENCLOSED ARE FILLED IN CORRECTLY.
  • Page 10: Using The Boiler Alu He

    Control panel ON/OFF BUTTON The control panel allows all operators to make all adjustments necessary to manage Sime ALU HE boilers and connected sys- ON = Boiler has electric power. tems. OFF = Boiler has electric power but is not available for operation.
  • Page 11: Start-Up

    Start-up Adjusting the delivery temperature The control panel on ALU HE boilers lets you manually adjust the 1.2.1 Preliminary checks delivery temperature on two temperature levels by choosing the best ones for the systems managed (e.g. 80°C and 50°C). WARNING To adjust the delivery temperature on the first of the two levels: Should it be necessary to access the areas in the bot- –...
  • Page 12: Fault / Malfunction Codes

    SIME remote control connection (optional then released. The boiler starts up again normally. accessory) The boiler is ready for connection to a SIME remote control. When the remote control is connected or, alternatively, when a remote supervision device is connected, the boiler display shows:...
  • Page 13: Maintenance

    MAINTENANCE DISPOSAL Servicing Disposal of the equipment (European Di- rective 2012/19/EU) For the appliance to operate correctly and efficiently it is recom- mended that the system manager calls upon the services of a Boilers and electrical and electronic appliances Professionally Qualified Technician to carry out ANNUAL main- used professionally or classified as profession- tenance.
  • Page 15 DESCRIPTION OF THE APPLIANCE TABLE OF CONTENTS Technical features......20 DESCRIPTION OF THE APPLIANCE Main water circuit .
  • Page 16: Description Of The Appliance

    Sime ALU HE if there is one, the control panel automatically carries out the auxiliary sensor and to the Sime Home or Sime Home Plus remote functional checks, and electrically powers the gas valve and igni- controls. They can manage direct systems or direct systems and tion transformer to turn on the flame.
  • Page 17: Domestic Hot Water (Dhw)

    Safety device may only be replaced by professional                      qualified personnel using Sime original spare parts.    ...
  • Page 18: Technical Data Plate

    4.3.1 Technical Data Plate ALU 80-116-160-200 HE Fonderie SIME S.p.A. Legnago - VR (Italy) - Tel. +39 0442 631111 NAME APPLIANCE TYPE CALDAIA A CONDENSAZIONE - CONDENSING BOILER - CALDERA DE CONDENSACION - CALDEIRA SERIAL NUMBER CONDENSACAO CHAUDIERE CONDENSATION CONDENSATIEKETEL...
  • Page 19: Structure

    Structure Front panel Gas valve Pressure transducer Pressure gauge fitting Return sensor (SR) Return manifold Boiler drain valve Foot Condensate siphon outlet Condensate collection tank Boiler return Smoke outlet fitting Combustion air inlet Boiler body Gas supply pipe Boiler delivery Delivery sensor System delivery manifold Top panel...
  • Page 20: Technical Features

    Technical features ALU HE DESCRIPTION CERTIFICATIONS AT - BE - CH - CY - CZ - DK - EE - ES - FI - FR - GB - GR - HU Country of intended installation IE - IT - LT - LV - NL - NO - PT - RO - SE - SI - SK Fuel G20 / G31 PIN number...
  • Page 21: Main Water Circuit

    Main water circuit Fig. 7 KEY: Delivery sensor M Boiler delivery R Boiler return Gas valve G Gas supply Water pressure transducer Sc Condensate outlet Return sensor (SR) Boiler drain valve Condensate siphon outlet Min. gas pressure switch Safety thermostat...
  • Page 22: Sensors

    Sensors Load losses The sensors installed have the following characteristics: The graph shows the curves for the load losses of the boilers, – boiler delivery, boiler return and flue gas probes NTC R25°C; necessary for the correct circulation pump to be chosen. 10kΩ...
  • Page 23: Control Panel

    4.10 Control panel The control panel allows all operators to make all adjustments DESCRIPTION OF COMMANDS necessary to manage Sime ALU HE boilers and connected sys- ON/OFF BUTTON tems. ON = Boiler has electric power. OFF = Boiler has electric power but is not available for operation.
  • Page 24: Wiring Diagram

    4.11 Wiring diagram GREEN BLUE GREEN BLACK BLACK GREEN BLACK BLUE BLUE GREEN BLUE CD. 63228900 49 50 BROWN BLUE CN12 SB/SA BROWN CN13 CN14 CN11 CN10 CN18 BLUE 0...10VDC BROWN BLUE KAPI BLUE BLUE BROWN BROWN KAEV RS485 BLUE Flame detection electrode Electrode on Min.
  • Page 25: Rs 485 Board

    – Connect the earth wire to an effective earthing sys- power supply through a fused mains switch, with tem. Sime declines all responsible for any injury or at least 3mm spacing between contacts, fused at damage to persons, animals,or property as a result...
  • Page 26 The Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commis- sioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the require- ments of the appropriate Building Regulations.
  • Page 27 INSTALLATION AND SERVICING INSTRUCTIONS Installer Checklist Please remember to carry out the following checks after installation. This will achieve complete customer satisfaction, and avoid unnecessary service calls. A charge will be made for a service visit where the fault is not due to a manufacturing defect.
  • Page 28: Installation

    Service or by qualified professionals who MUST suitable protective safety equipment. wear Receiving the product Appliances Sime ALU HE are supplied in a single package, pro- tected by a nylon cover, placed on wooden pallets. Fig. 13 ALU HE...
  • Page 29: Ventilation Requirements

    Adding Fernox F1 or Mb-1 will guard against corrosion. New installation or installation of a re- – Sime promote the fitting of TF1 System filter with any new boil- placement appliance er installation. The boiler must be installed in a fixed location and only by spe- –...
  • Page 30: Plumbing Connections

    CAUTION Plumbing connections – It is recommended that a condensate neutralising The dimensions of the water fittings of Sime ALU HE boilers are unit be provided and the pipework should have a given below. downward angle of at least 3%.
  • Page 31: Smoke Outlet And Combustion Air Inlet

    Fig. 20 WARNINGS – When the Sime ALU HE boiler takes in combustion air from the place of installation it MUST BE EQUIPPED Øi with air vents created as described by the regula- tions in force in the destination country.
  • Page 32: Maximum Duct Lengths

    5.11.1 Maximum duct lengths C43/63 The table shows the maximum permitted lengths for the smoke outlet and combustion air inlet ducts, expressed in metres. Maximum permitted length (m) ALU HE Inlet Outlet Inlet Outlet Øi 80 mm Øi 160 mm Øi 100 mm Øi 200 mm Load loss - Equivalent lengths...
  • Page 33: Electrical Connections And External Controls

    – to use the water pipes to earth the appliance. KEY: Primary circuit pump (4A - 230V) (*) Sime declines all responsible for any injury or damage to Live persons, animals,or property as a result of failure to provide Neutral adequate earthing of the appliance.
  • Page 34: External Sensor

    5.12.1 External sensor When fitting the sensor on the outside of the building: – remove the cover The boiler is designed for connection to an external temperature – attach the sensor to the wall using 2 plugs sensor code 8094101, which will automatically regulate the cen- –...
  • Page 35: Systems That Can Be Controlled

    When systems using ALU HE single or cascade boilers can be a single appliance or a group of cascading boilers which are managed by MODBUS systems, Sime kits CANNOT can considered as a single appliance in terms of heat output, be used to manage mixed circuits or the solar circuit.
  • Page 36 MIX 1 ZONE KIT (code 8092275) and MIX 2 ZONE KIT (code 8092276). When systems using ALU HE single or cascade boilers are managed by MODBUS systems, Sime kits CANNOT be used to manage mixed circuits or the solar circuit. You MUST use external devices.
  • Page 37 Hydraulic diagram with tank after hydraulic separator Italy only Mix 1 Zone kit code 8092275 Vsic VMIX 1 P MIX 1 Smz1 Hydraulic diagram with tank before hydraulic separator Italy only Mix 1 Zone kit code 8092275 Vsic VMIX 1 PMIX 1 Smz1 KEY:...
  • Page 38 Underfloor heating hydraulic diagram Italy only Mix 1 Zone kit code 8092275 Vsic VMX1 PMIX 1 Smz1 VZ 1 VZ 2 KEY: External sensor Hydraulic separator Mix 1 Zone pump Room thermostat for boiler Primary circuit pump (only for installations with a SINGLE boiler) activation Condensate neutraliser VMIX 1...
  • Page 39: Refilling Or Emptying

    Fig. 29 5.14.2 SYSTEM Filling boilers DO NOT have a device to fill the boiler/sys- Sime ALU HE tem and an emptying tap. Therefore these must be provided, during installation, assembled in the most convenient places for the installer. Before carrying out the operations described below, make sure that the main system switch is set to "ON"...
  • Page 40: Commissioning

    COMMISSIONING When heat is requested from the systems the boiler or the cas- Preliminary operations cade automatically carries out: – the operational checks WARNING – ignition and starts automatic operation. Should it be necessary to access the areas in the bot- tom part of the appliance, make sure that the system CAUTION components and pipes are not hot (risk of burning).
  • Page 41: List Of Parameters

    List of parameters The parameters PAR 01 and PAR 02 are factory set according to TABLE “B” table “A” and automatically generate the settings for parameters Description PAR 04, PAR 08, PAR 18 and PAR 31 as shown in the table. Instant monothermal –...
  • Page 42: Configuring The Auxiliary Sensor

    Type Description Range Step Default -- = not enabled Boiler address (specific to boilers in a cascade) 0 = master "- -" 1…7 = slaves -- = not enabled Not used "- -" 1…31 = slaves Not used 1…30 seconds See table Post-ventilation time 1...180...
  • Page 43: Fault/Error Message

    When, in addition to the message "ALL ..." the symbol NOTE: Fault/error message also appears on the display, after having repaired the In the event of a fault/malfunction the message "ALL" will ap- fault, button must be pressed for approx. 3 seconds, and pear on the display with the alarm number and the light bar (4) then released.
  • Page 44: Gas Calibration

    – measure the CO and check that it corresponds to the value Gas calibration in the table. If it does not correspond, adjust the "maximum After checking that the boiler is operating correctly, you must power adjustment screw" (2) on the gas valve until you obtain take combustion readings as well as maximum and minimum the CO value shown in the table.
  • Page 45: Operating Data Display

    Operating data display Once the boiler is operating, a qualified technician can view the operating data. To access the information, press the button. The first piece of information is shown on the display. Each time this button is pressed, the next piece of information is shown. button is not pressed, the system exits the function automatically.
  • Page 46 18. Heating return sensor value (SR) 29. Valve close command with MIX 2 ZONE board, respectively ON and OFF 30. Solar sensor temperature with solar board 19. Cascade manifold sensor value 31. Solar sensor temperature with solar board 20. Mixed system delivery probe value with MIX 1 ZONE board 32.
  • Page 47: Gas Conversion

    Qualified Personnel. ing the procedure described in the relevant paragraph. boilers in the 80 , 116 , 160 and 200 models are sup- Sime ALU HE CAUTION plied to operate with G20 gas, but can also function using G31 If the gas supply is changed from G20 to G31, mark the gas.
  • Page 48: Maintenance

    MAINTENANCE Servicing For the appliance to operate safely, correctly and efficiently, cur- rent legislation requires that the system manager call upon the services of a professionally qualified technician to carry out reg- ular maintenance, at least annually or according to the specific legal provisions CAUTION –...
  • Page 49: Cleaning Boiler Body

    (14) – Use a rod suitable for mechanically cleaning the boiler body ducts (e.g. Sime accessory (15) code 6077930). A chemical product can be used provided it is suitable for aluminium bod- ies working by condensation (e.g. Bekaert TAB 2/2000).
  • Page 50: Connecting The Air Pressure Switch And Siphon

    7.3.6 Connecting the air pressure switch and siphon Circuit Board Replacement The silicon tubes on the air pressure switches (1) and siphon If you replace the electronic circuit board or gas valve YOU MUST (2) MUST be reconnected, where it was necessary to disconnect SET THE PARAMETERS as described under "Parameter setting them, as shown in the figure: and display".
  • Page 51 Type of malfunction or Shown on display Cause Solution fault - Check whether there is little water in the system - Check the primary circulation pump The boiler stops due to activation of Safety thermostat or - Check for possible obstruction of condensate drain the safety thermostat or the siphon siphon pressure switch - Check the electrical wiring and connections of the...
  • Page 52 Type of malfunction or Shown on display Cause Solution fault S2 solar exchanger probe The probe on the solar exchanger is - Check the sensor and its board connections fault (tank) open or has short-circuited - Check operation of the board The delivery probe on the 2nd sys- S3 2nd solar system deliv- - Check the sensor and its board connections...
  • Page 53 CASCADING SYSTEMS TABLE OF CONTENTS CASCADING SYSTEMS EXPLODED VIEWS Cascade characteristics ......54 Characteristics of cascading boilers ....54 10 APPENDIX 1 (GUIDANCE HHIC) Approximate clearance measurements .
  • Page 54: Cascading Systems

    CASCADING SYSTEMS Cascade characteristics Approximate clearance measurements Each boiler connected in a cascade must be identified with a specific address than can be set under the relevant parameter (PAR 15), which determines how it behaves. WARNINGS For the cascade to function correctly, the external sen- sor (SE) must be installed.
  • Page 55: Main Primary Circuit

    Main primary circuit boilers can be connected in a cascade without ad- Sime ALU HE ditional components as they are equipped with the specific cas- cade board as standard. The cascade can be made up of between two and eight boilers of the same model (e.g. three ALU HE 80 ).
  • Page 56: Technical Features

    Technical features ALU HE DESCRIPTION CERTIFICATIONS AT - BE - CH - CY - CZ - DK - EE - ES - FI - FR - GB - GR - HU Country of intended installation IE - IT - LT - LV - NL - NO - PT - SE - SI - SK Fuel G20 / G31 PIN number...
  • Page 57: Smoke Outlet And Combustion Air Inlet

    Load loss - Equivalent lengths Smoke outlet and combustion air inlet Leq (linear metres) The smoke outlet MUST be sized by an expert and installed by an Inlet Outlet installer who MUST use approved materials, suited to the type of ALU HE 45°...
  • Page 58: Electrical Connections For The Cascade

    Electrical connections for the cascade The electrical connections between the Sime ALU HE boilers WARNINGS which make up the cascade are shown in the following diagram, – The external temperature sensor “SE” is OBLIGATORY and the wiring diagrams for the individual appliances are shown and MUST be connected to the master boiler on the next few pages.
  • Page 59: Master Boiler Wiring Diagram

    8.10 Master boiler wiring diagram GREEN BLUE GREEN BLACK BLACK GREEN BLACK BLUE BLUE GREEN BLUE CD. 63228900 49 50 BROWN BLUE CN12 SB/SA BROWN CN13 CN14 CN11 CN10 CN18 BLUE 0...10VDC BROWN BLUE KAPI BLUE BLUE BROWN BROWN KAEV RS485 BLUE Flame detection electrode...
  • Page 60: Wiring Diagram For Slave 1 Boiler

    8.11 Wiring diagram for slave 1 boiler GREEN BLUE GREEN BLACK BLACK GREEN BLACK BLUE BLUE GREEN BLUE CD. 63228900 49 50 BROWN BLUE CN12 SB/SA BROWN CN13 CN14 CN11 CN10 CN18 BLUE BROWN BLUE KAPI BLUE BLUE BROWN BROWN KAEV RS485 BLUE...
  • Page 61: Wiring Diagram For Slave 2-7 Boilers

    8.12 Wiring diagram for slave 2-7 boilers GREEN BLUE GREEN BLACK BLACK GREEN BLACK BLUE BLUE GREEN BLUE CD. 63228900 49 50 BROWN BLUE CN12 SB/SA BROWN CN13 CN14 CN11 CN10 CN18 BLUE BROWN BLUE KAPI BLUE BLUE BROWN BROWN KAEV RS485 BLUE...
  • Page 62: Displaying And Setting Cascade Parameters

    Range Step Default Choosing 0 = fixed set The parameters for Sime ALU HE boilers in a cascade can be dis- the cascade 1 = dynamic played and set in the same way as with single boilers (see “Pa- strategy rameter setting and display”...
  • Page 63 Benchmark Commissioning & Warranty Validation Service Record It is a requirement that the boiler is installed and commissioned to the manufacturers’ To instigate the boiler warranty the boiler needs to be registered with the manufacturer within one month of the installation. The warranty rests with the end-user (consumer), and they should be made aware it is ultimately their responsibility to register with the manufacturer, within the allotted time period.
  • Page 64 GAS BOILER SYSTEM COMMISSIONING CHECKLIST & WARRANTY VALIDATION RECORD Address: Boiler make and model: Boiler serial number: Commissioned by (PRINT NAME): Gas Safe registration number: Company name: Telephone number: Company email: Company address: Commissioning date: Heating and hot water system complies with the appropriate Building Regulations? Time, temperature control and boiler interlock provided for central heating and hot water Boiler Plus requirements (tick the appropriate box(s)) Weather compensation...
  • Page 65 SERVICE & INTERIM BOILER WORK RECORD It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service / interim work record is completed. Service provider When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the SERVICE/INTERIM WORK ON BOILER SERVICE/INTERIM WORK ON BOILER Date:...
  • Page 66 SERVICE & INTERIM BOILER WORK RECORD It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service / interim work record is completed. Service provider When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use the SERVICE/INTERIM WORK ON BOILER SERVICE/INTERIM WORK ON BOILER Date:...
  • Page 67 EXPLODED VIEWS ALU HE 80 - 116 - 160...
  • Page 68 ALU HE 200 - 240 - 280...
  • Page 69 ALU HE 80 - 116 - 160...
  • Page 70 ALU HE 200 - 240 - 280...
  • Page 71 ALU HE 80 - 116...
  • Page 72 ALU HE 160...
  • Page 73 ALU HE 200 - 240 - 280...
  • Page 74 ALU HE 80 - 116 - 160 - 200 - 240 - 280...
  • Page 75 ALU HE ALU HE Pos. Code Description Pos. Code Description 80 116 160 200 240 280 80 116 160 200 240 280 6261520 Tray 6089721 Gas valve 6261521 Tray 6089722 Gas valve 6120401 Adjustable foot Square flange with 1" 6163101 connectio 6096910 Support Square flange for gas...
  • Page 76 ALU HE ALU HE Pos. Code Description Pos. Code Description 80 116 160 200 240 280 80 116 160 200 240 280 2051201 Hose clamp Ø 70-90 100 6302000 Plastic pin Rotation control panel 2051202 Hose clamp Ø 90-110 101 6267138 bracket Casing front upper 6323616...
  • Page 77 10 APPENDIX 1 (GUIDANCE HHIC) Manufacturers Instructions Manufacturer’s instructions must be followed for the correct connection of the condensate discharge pipe from the boiler as this may vary due to the design of the boiler. For example a visible air break and trap is not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler.
  • Page 78 Figure 1 – Connection of condensate discharge pipe to internal soil and vent stack. Note – Check manufacturer’s instructions to see if an air break is required. Boiler Visible air break 75 mm trap Visible air break and trap not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler Soil and vent stack Invert...
  • Page 79 Internal Condensate Pipe Discharge Termination Figure 2(a) – Connection of a condensate discharge pipe downstream of a sink, basin, bath or shower waste trap. Note – Check manufacturer’s instructions to see if an air break is required. Boiler Visible air break 75 mm trap Visible air break and trap not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler.
  • Page 80 Internal Condensate Pipe Discharge Termination Figure 2(b) – Connection of a condensate discharge pipe upstream of a sink, basin, bath or shower waste trap Boiler Visible air break at plug hole – alternative connection can be below sink trap 75 mm sink, basin, bath or shower waste trap Open end of condensate discharge pipe direct into gully 25 mm min below grating but above water level;...
  • Page 81 Internal Condensate Pipe Discharge Termination The possibility of waste pipes freezing downstream of the connection point should be considered when determining a suitable connection point - e.g. a slightly longer pipe run to an internal soil stack may be preferable to a shorter run connecting into a kitchen waste pipe discharging directly through the wall to an external drain.
  • Page 82 Internal Condensate Pipe Discharge Termination Figure 3 – Connection of a condensate pump - typical method (NB manufacturer’s detailed instructions should be followed). Note – Any external pipe work should be insulated, pipe cut at 45 degrees and a drain/ leaf Condensate discharge from boiler Condensate pump Visible air break at plug hole...
  • Page 83 External Connections External Connections pumped connection is impractical to install. The pipe work from the boiler should be of a minimum 19mm ID or as per manufacturer’s instructions and the condensate discharge pipe shall be run in a standard drainpipe material, e.g. poly (vinyl chloride) (PVC), un-plasticized poly (vinyl chloride) (PVC-U), acrylonitrile butadiene-styrene (ABS), polypropylene (PP) or chlorinated poly (vinyl chloride) (PVC-C).
  • Page 84 External Connections Figure 4 – Connection of condensate discharge pipe to external soil and vent stack Boiler Visible air break 75 mm trap Visible air break and trap not required if there is a trap with a minimum condensate seal of 75mm incorporated into the boiler.
  • Page 85 External Connections Alternative Solutions Cold weather protection methods approved or endorsed by boiler manufacturers and/or service organisations may be adopted if these are considered suitable by the parties involved. It is the responsibility of the manufacturer of these products to ensure they have completed the necessary testing or calculations to ensure the product offers suitable protection to prevent the condensate pipe from freezing.
  • Page 86 External Connections Electric Trace Heating condensate pipe to raise the temperature of the condensate pipe in freezing conditions. Trace heating takes the form of an electrical heating element run in physical contact along the length of the condensate pipe. The pipe is usually covered with thermal insulation to retain heat losses from the pipe.
  • Page 87 External Connections Figure 5 – External termination to rainwater downpipe (NB only combined foul/rainwater drain) Condensate discharge pipe from boiler Pipe size transition point Water/weather proof insulation 43mm 90° male/female bend External rain water pipe into foul water External air break Air gap Minimum internal diameter 19mm Minimum internal diameter 30mm...
  • Page 88 External Connections External Termination of the Condensate Pipe Where the condensate discharge pipe is terminated over an open foul drain or gully, the pipe should terminate below the grating level, but above water level, in order to minimise “wind chill” at the open end. Pipe drainage and resistance to freezing will be improved if the termination end of the condensate pipe is cut at 45 degrees as opposed to a straight cut.
  • Page 89 External Connections Figure 6 – External drain, gully or rainwater hopper Boiler Visible air break 38mm minimum trap Visible air break and trap not required if there is a trap with a minimum condensate seal of 38 mm incorporated into the boiler – refer to manufacturers instructions External length of pipe 3 m maximum Open end of condensate discharge pipe direct into gully 25 mm min below grating but above water level;...
  • Page 90 External Connections Figure 7 – Example of a purpose made soakaway Condensate discharge pipe from boiler Ground (this section of the condensate discharge pipe may be run either above or below round level); End cut at 45° Diameter 100 mm minimum plastic tube Bottom of tube sealed Limestone chippings Two rows of three 12 mm holes at 25 mm centres, 50 mm from bottom of tube and facing...
  • Page 91 Turn off appliance and call SIME LTD Technical HelplIne for advice. NOTE - if no flue gas sampling point is present and the correct pro- cedure is not specified in the manual, contact SIME LTD Technical the appliance must not be commissio- Helpline for advice.
  • Page 92 Sime Ltd 1a Blue Ridge Park Thunderhead Ridge Glasshoughton, Castleford, WF10 4UA Phone: 0345 901 1114 Fax: 0345 901 1115 www.sime.co.uk Email: enquiries@sime.co.uk...

Table of Contents