Place h1 inside or outside the sauna/steam room. If h1 is installed inside a sauna room,
the top of the unit must not be more than 90 cm (35 inches) above floor level.
Start by applying the seal, if necessary (fig. 1). Screw the back panel to the wall so the
electric cables pass through the opening in the panel (fig. 2). Place the panel so that the
hole for the retainer screw is facing downwards. Connect wires to terminals as shown in
the wiring diagram (figs. 2 and 5). Slide glass screen/printed circuit up onto back panel
and press bottom edge into place (fig. 3). Insert retainer screw (fig. 4).
Figure 1

Wiring diagram

Wiring diagram
Wiring diagram
Wiring diagram
Figure 5
An external switch may be connected to the h1 panel via terminals 19 and 20 on the
printed circuit (also 21 if an indication signal is required). See wiring diagram (fig. 5).
Momentary on/off switch: switch activates on/off function when pressed.
Continuous circuit: the panel remains operative for as long as the connection is
maintained, but never longer than the programmed running time.
Figure 2
1. Sauna heater/steam generator
2. Thermistor (sensor)
3. h1
4. External switch
11
Figure 4
Figure 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents