Bosch BOVA Series Installation Instructions Manual page 23

2.0 split system heat pump, condensing units up to 20.5 seer, 2-3-4-5 ton capacity, r410a
Hide thumbs Also See for BOVA Series:
Table of Contents

Advertisement

Installation Instructions
6.
Adjust refrigerant level to attain proper gauge pressure.
Add refrigerant if the subcooling reading from Table 8 is lower
than the designed value (Table 9).
Connect gauges to refrigerant bottle and unit as illustrated (Fig. 41).
Purge all hoses.
Open tank.
Stop adding refrigerant when subcooling matches the design value (Table
9).
Recover refrigerant if the subcooling reading from Table 8 is higher
than the design value (Table 9).
Figure 41
7.
Stabilize the system.
Wait 5 minutes for the system condition to stabilize between adjustments.
When the subcooling matches the design value (Table 9), the system is
properly charged.
Remove gauges.
Replace service port caps to prevent leaks. Tighten finger tight plus an
additional 1/6 turn.
Bosch Thermotechnology Corp. | 02.2019
8.
Record System Information for reference (Table 10).
Record system pressures and temperatures after charging is complete.
Description
Outdoor model number
Measured Outdoor Ambient
Measured Indoor Ambient
Measured Liquid Line Temp
Measured Suction Line Temp
Liquid Gauge Pressure
Suction Gauge Pressure
Table 10
Bosch IDS BOVA | 23
Value
°F
°F
°F
°F
PSIG
PSIG
Data subject to change

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bova-36Bova-60

Table of Contents