Forbidden to process flammable or toxic material! CD series of cabinet dryer are mostly used for simultaneous drying of different kinds of polymers in small quantities or for drying materials for trial moulding. They can also be applied in electronic engineering, electroplating, pharmacy, paint baking, printing industries, etc.
Chapter 6, which contains service instructions intended for service engineers. Other chapters contain instructions for the daily operator. Any modifications of the machine must be approved by SHINI in order to avoid personal injury and damage to machine. We shall not be liable for any damage caused by unauthorized change of the machine.
1.4.2 Transportation and Storage of the Machine Transportation and storage of the machine 1) CD series are packed in crates or plywood cases with wooden pallet at the bottom, suitable for quick positioning by fork lift. 2) After unpacked, castors equipped on the machine can be used for ease of movement.
Page 10
and humidity below 80%. 2) Disconnect all power supply and turn off main switch and control switch. 3) Keep the whole machine, especially the electrical components away from water to avoid potential troubles caused by the water. 4) Plastic film should be used to protect the machine from dust and rains. Working environment 1) Indoors in a dry environment with max.
The following statements clarify the responsibilities and regulations born by any buyer or user who purchases products and accessories from Shini (including employees and agents). Shini is exempted from liability for any costs, fees, claims and losses caused by reasons below: 1) Any careless or man-made installations, operation and maintenances upon machines without referring to the Manual prior to machine using.
2. Structure Characteristics and Working Principle 2.1 Main Functions For cabinet dryer, materials to be dried are placed on the stainless steel made moveable material trays. During operation, process air will flow to heating wire and be heated up to required temperature, then flow through a manifold with evenly scattered holes.
3. Installation and Debugging Install the CD Cabinet Dryer at a proper place where is easy for service and maintenance. 3.1 Attentions During Installation 1) Make sure voltage and frequency of the power source comply with those indicated on the manufacture's plate, which is attached to the machine. 2) Power cable and earth connections should conform with local regulations.
3.3 Check the Rotation Direction of Blower 1) Check whether the wind direction of inlet and outlet on the two sides of oven is right. 2) If the rotation direction is not right: a. Stop the machine. b. Turn off the main switch. c.
4. Application and Operation Open the distribution box and connect the power source in accordance with wiring diagram. Make sure that the power voltage is in compliance with the required specifications. Notes: Before connecting, the main switch and heat switch should be off.
4.2.1 Keys Operature Instruction Parameter layer selection key 1) If select this key under common condition, system will enter Parameter layer selection mode, and press this key again to Select parameter layer. If want to enter parameter mode, please Press key.
2) Under parameter mode, press down key to select the parameters of this parameter layer. 3) Under setting mode, press down key to increase the parameters' value until their lower limit. 4.3 Adjustment of Air Rate Adjustment of air rate is the most important factor for the drying result, should adjust the air outlet and inlet when drying different material.
Picture 4-3: Start-up Timer Setting Output setting Open setting: Reverse the setting section of dial entad, at this time, red mark appears in the dial.(shown in the above picture) Close setting: Reverse the setting section of dial to the outside, the red mark disappears, then rotate the timing dial to the switch position.
5. Trouble-shooting Fault Possible reasons Solution 1. Turn on the motor switch. 1. The motor switch isn't open. It doesn't start after 2. Replace a new fuse. turning on the main 2. The fuse is broken. switch. 3. The transformer is burnt out. 3.
6.1 Maintenance Schedule 6.1.1 About the Machine Model Manufacture date Voltage Ф Frequency Power 6.1.2 Electrical Installation Voltage: Fuse melt current: 1 Phase 3 Phase Check phase sequence of the power supply. 6.1.3 Daily Checking Check power supply wires. Check the start/stop function. 6.1.4 Weekly Checking Check the switches of the machine.
Need help?
Do you have a question about the CD Series and is the answer not in the manual?
Questions and answers