Start-Up Checklist - Carrier 42DH 06 Installation, Start-Up And Service Instructions Manual

Horizontal direct drive blower fan coils
Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or prop-
erty when completing the procedures listed in this start-up checklist,
use good judgment, follow safe practices, and adhere to the safety
considerations/information as outlined in preceding sections of this
Installation, Start-Up, and Service document.
THE RELIABLE OPERATION AND LONG SERVICE LIFE OF THIS EQUIPMENT CAN BE IMPROVED WITH PROPER
INSTALLATION, OPERATION AND REGULAR MAINTENANCE. THE EQUIPMENT IS INITIALLY PROTECTED UNDER
CARRIER'S STANDARD WARRANTY. THIS WARRANTY IS PROVIDED UNDER THE CONDITION THAT THE
FOLLOWING STEPS BE FOLLOWED IN DETAIL. SHOULD ANY QUESTIONS ARISE, PLEASE CONTACT YOUR LOCAL
SALES REPRESENTATIVE OR THE FACTORY BEFORE ATTEMPTING ANY INSTALLATION OR OPERATION OF THE
EQUIPMENT.
I. PRELIMINARY INFORMATION
MODEL NO. _______________________________________________ SERIAL NO. ____________________________________
ADDITIONAL ACCESSORIES ________________________________________________________________________________
Receiving and Inspection
WAS THE UNIT RECEIVED UNDAMAGED?
IS THERE ANY SHIPPING DAMAGE?
IF SO, WHERE: _____________________________________________________________________________________________
___________________________________________________________________________________________________________
WILL THIS DAMAGE PREVENT UNIT START-UP?
WAS THE UNIT RECEIVED COMPLETE AS ORDERED?
ARE "FURNISH ONLY" PARTS ACCOUNTED FOR?
IS THE UNIT ARRANGEMENT/HAND CORRECT?
IS THE UNIT STRUCTURAL SUPPORT COMPLETE AND CORRECT?
Handling and Installation
IS THE UNIT SECURED AND MOUNTED PROPERLY?
ARE MOUNTING GROMMETS/ISOLATORS USED?
IS THE UNIT MOUNTED LEVEL AND SQUARE?
IS PROPER ACCESS PROVIDED FOR THE UNIT AND ACCESSORIES?
IS THE PROPER ELECTRICAL SERVICE PROVIDED?
IS THE PROPER OVERCURRENT PROTECTION PROVIDED?
IS THE PROPER SERVICE SWITCH/DISCONNECT PROVIDED?
IS THE CHILLED WATER LINE PROPERLY SIZED TO THE UNIT?
IS THE HOT WATER LINE PROPERLY SIZED FOR THE UNIT?
IS THE REFRIGERANT LINE PROPERLY SIZED TO UNIT?
ARE ALL SERVICES TO UNIT IN CODE COMPLIANCE?
ARE ALL SHIPPING SCREWS AND BRACES REMOVED?
IS THE UNIT PROTECTED FROM DIRT AND FOREIGN MATTER?
Cooling/Heating Connections
IS FIELD PIPING CONNECTED TO UNIT?
HAS ALL PIPING BEEN PRESSURE TESTED FOR LEAKS?
ARE DRAIN LINE AND TRAPS INSTALLED, AS REQUIRED?
IS ALL PIPING AND VALVES INSULATED, AS REQUIRED?
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53420019-01

START-UP CHECKLIST

(Y/N) __________
(Y/N) __________
Printed in U.S.A.
Form 42DH-2SI
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
(Y/N) __________
Pg CL-1
8-19
Replaces: 42DH-1SI

Advertisement

Table of Contents
loading

This manual is also suitable for:

42dh 1242dh 1642dh 2042dh 0842dh 3042dh 22 ... Show all

Table of Contents