Quick Start Guide: LPC435x-Xplorer++
3.3.2 User Input Switch
Test setup and verification:
Once the VCOM drivers are installed the Xplorer++ waits for the User Input Switch to be pressed. Only
after detecting a user button (SW2) press the test firmware proceeds with validating other peripherals.
This synchronization is necessary to ensure that the debug messages on the VCOM port can be viewed
from the start of the test. Without this synchronization the test firmware would proceed with the debug
messages being displayed, while the user is still configuring the Hyper-Terminal or other serial
emulation tool.
Once the hardware initialization is completed menu will be displayed as shown in the following image
21
Fig.21
Fig.22
www.ngxtechnologies.com
Need help?
Do you have a question about the LPC435x-Xplorer++ and is the answer not in the manual?
Questions and answers