Installation; Installation Checklist - Philips Avalon FM20 Instructions For Use Manual

Fetal monitor
Hide thumbs Also See for Avalon FM20:
Table of Contents

Advertisement

Installation

2
Installation should be carried out by qualified service personnel, either by the hospital's biomedical
department, or by Philips Support.
As the first step in preparing the monitor for use, follow the installation instructions given in
this chapter.
For a list of conventions used in this guide, see "Basic Operation" on page 19.
Not all accessories and supplies may be available in all geographies. Please contact your local Philips
sales representative for details of availability.

Installation Checklist

Use this checklist to document your installation.
Step
1
2
3
4
5
6
7
8
Task
Perform initial inspection of delivery, unpack and check the shipment
(see "Unpacking and Checking the Shipment" on page 14)
Mount the monitor as appropriate for your installation (see "Mounting
the Monitor" on page 15)
Connect the fetal monitor to AC mains using the supplied power cord.
This configuration varies, depending whether an external power
supply/battery option is used. (see "External Power Supply M8023A"
on page 58)
Perform Safety Tests (see "Safety Tests" on page 18)
Check that default settings (including the line frequency) are
appropriate for your institution
Check/set the paper scale (see "Checking/Setting Paper Scale" on
page 42)
Load paper into the recorder (see "Loading Paper: FM20/FM30" on
page 44 or "Loading Paper: FM40/FM50" on page 45, depending on
your monitor)
Check/set the time and date (see "Setting the Date and Time" on
page 35)
2
Check Box
when Task
Done
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avalon fm40Avalon fm30Avalon fm50

Table of Contents