Omron Sysmac NYB-0 Series Hardware User Manual page 146

Industrial pc platform, industrial box pc
Table of Contents

Advertisement

5 Installation
Ground Connection Details
This section provides details about the ground connection.
Use the functional ground terminal on the mounting bracket(s) to ground your Industrial Box PC.
The washers and nut C are supplied with the bracket(s).
Refer to Items Supplied with the Brackets on page 5-4 for details.
Book Mount
A
B
Mount the ground connection wire B to the functional ground terminal A using the washers and nut
C . Tighten the nut with a torque of 1.2 N·m max.
Refer to 5-3-8 Book Mount Procedure on page 5-24 for book mounting details.
Wall Mount
A
B
Mount the ground connection wire B to the functional ground terminal A using the washers and nut
C . Tighten the nut with a torque of 1.2 N·m max.
Refer to 5-3-9 Wall Mount Procedure on page 5-25 for wall mounting details.
5-32
7
C
7
C
NY-series Industrial Box PC Hardware User's Manual (W553)

Advertisement

Table of Contents
loading

Table of Contents