Boiler Disposal - SAS BIO SOLID 19 Operation And Maintenance Manual

Table of Contents

Advertisement

Components used in the boiler are made of materials which physical state and
chemical activity changes at temperatures significantly exceeding temperatures that
can be reached during normal operation of the boiler. Materials used for construction
of the device do not emit substances hazardous to the environment, even in condi-
tions exceeding normal operational conditions of the boiler.
To dispose of the boiler, transfer the used device to a specialist disposal company,
in accordance with current specific regulations in force in a country of destination.
Components protecting the boiler for the transport: plastic film, bags, plastic mate-
rials, should be transferred to a relevant waste collection entity. The SAS BIO SOLID
boiler is equipped with digital equipment subject to selective collection of electrical
and electronic equipment (a sign of a crossed-out basket on a nominal plate). The
steel structure of the boiler should be disposed of as steel scrap. Before scrapping,
disconnect the controller, the fan, the gearmotor, and power supply cables. Insulation
materials (e.g., mineral wool, sealant, thermal insulation, etc.) should be transferred
to a relevant waste collection entity. The waste collection place should be specified by
relevant municipal or commune services.
15. WARRANTY TERMS AND CONDITIONS
1.
The manufacturer grants to the Buyer a warranty for the SAS BIO SOLID
boiler under terms and conditions specified in this warranty. It is confirmed
with the company seal.
2.
The manufacturer guarantees efficient work of the boiler when it is installed
and operated according to all conditions and guidelines specified in the
operation and maintenance documentation.
3.
The Buyer is issued with the operation and maintenance documentation,
specifying principles for correct operation of the boiler, together with the
warranty terms and conditions. It is mandatory to become acquainted with
the operation and maintenance documentation.
4.
Deadline for the guarantee shall be calculated from the date of issue of the
subject matter of the contract to the purchaser (entered in the warranty card
and confirmed by the document purchase) and is:
a.
b.
c.
d.
Driver
Module controlling burner operation
Blower fan
Pressure relief valve
Gear-motor
52

14. BOILER DISPOSAL

5 years for efficient operation of the boiler
2 years on additional heat partition of the clean out doors/furnace
2 years for efficient operation of the burner
2 years for electronic and automatic sub-assemblies installed in the
boiler and manufactured by other producers:

Advertisement

Table of Contents
loading

Table of Contents