SAS MI Series Technical - Start - Up Documentation

SAS MI Series Technical - Start - Up Documentation

For heating installations

Advertisement

Quick Links

Z A K Ł A D M E T A L O W O - K O T L A R S K I
28-100 Busko-Zdrój, Owczary, ul. Przemysłowa 3
Phone: +48 41 378 46 19, Fax: +48 41 370 83 10
TECHNICAL - START - UP DOCUMENTATION
of water boiler's for heating installations
SAS MI type
adopted for black coal combustion of fine coal
BOILER
SAS MI
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MI Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SAS MI Series

  • Page 1 28-100 Busko-Zdrój, Owczary, ul. Przemysłowa 3 Phone: +48 41 378 46 19, Fax: +48 41 370 83 10 TECHNICAL - START - UP DOCUMENTATION of water boiler’s for heating installations SAS MI type adopted for black coal combustion of fine coal BOILER SAS MI...
  • Page 2 INDEX page Conformity declaration Introduction Use of boiler Boiler construction description Technical data Fuel Boiler’s assembly guidelines Requiremends for boiler-room Boiler’s arragement Connecting boiler to a chimney Connecting boiler to a chimney installation Connecting boilers to electrical installation Operation and installation guidelines Filing with water Boiler’s firing up Table (technical –...
  • Page 5 Careful reading of the manual will help in effective and safe exploitation of the boiler. 2. USE THE BOILER Boilers of SAS MI type are designated for water installations of the central heating systems, open type with gravitational forced...
  • Page 6: Technical Data

    so it is not replaceable. Between water grate there are cast iron movable grates (pos. 11 Under a heat exchanger, on its entire section, there is an ash pan chamber. There is an opening for combustion chamber cleaning (pos. 24)on the sidewall. At the upper part of boiler, under the cover (pos.
  • Page 7: Requirements For Boiler-Room

    BOILER’S ASSEMPLY GUIDELINES Boiler’s assembling should be performed by qualified and authorized personnel (qualified person upon adequate training and authorized for performing maintenance and repair works). The fitter’s obligation is to get familiar with the product, its functioning and protection systems functionality. Prior to boiler’s assembling it is strictly necessary to get familiarized with the content of hereby Technical-Start-Up Documentation.
  • Page 8 In addition, those pipes and the pressure vessel should be protected against freezing. Boilers of SAS MI type may work with gravitational or forced water circulation. If installation is provided with circulation pump, than on feeding/return pipe the differential valve should be installed.
  • Page 9 NOTE: It is recommended to connect the boiler to heating system provided with three- or four-pass valve. The main advantage of such connection is boiler protection function against low temperature corrosion, preventing it from premature wear. If not satisfactory to comply with manufacturer’s recommendations in reference to maintaining given heating water temperature ranges occurs (table TECHNICAL –...
  • Page 10 7.2. FIRING UP A BOILER Firing up a fuel in boiler should be started when checked if heating installation is filled with water, and water is not frozen. It should also be checked, if water is not leaking through thread fittings on boiler. Do not forget to heat the chimney prior to the firs startup.
  • Page 11 TECHNICAL AND OPERATION PARAMETER OF SAS MI BOILER Parameter Unit SAS MI Boiler power 12,5 Boiler heated surface Boiler efficiency 79,0 ÷ 83,1 Fuel consumption * kg/h Load chamber capacity ~120 ~150 ~180 Exhaust temperature °C 90 ÷ 210 Boiler water capacity...
  • Page 12 TECHNICAL AND OPERATION PARAMETERS OF SAS MI BOILER Parameter Unit SAS MI Boiler power 10.0 12.0 14.0 16.0 18.0 Boiler heated surface 79,0 ÷ 83,1 Boiler efficiency Fuel consumpcion kg/h 10,1 12,3 13,6 15,1 17,2 Load chamber capacity ~135 ~190...
  • Page 13 BOILER CONSTRUCTION SCHEME OF SAS MI TYPE (12,5 – 48 kW) boiler casing (body) ash box door 15. temperature regulator (controller) 22. smoke conduit cleaning hole insulation ash drawer 16. blowing fan 23. return water connector pipe water jacket water grates 17.
  • Page 14 BOILER CONSTRUCTION SCHEME OF SAS MI TYPE (52 – 200 kW) boiler casing (body) water grate 14. hot water connector pipe 20. thermometer installation connector pipe insulation furnace chamber 15. furnace gas chamber cover 23. blowdown connection water jacket fuel load door 16.
  • Page 15: Cleaning The Boiler

    7.3. BURNING SAS MI type boiler exploitation is performed based on cycling batching system, what means, that once the whole bath of fuel placed in a combustion chamber is burned out and an ash is removed, new charging with fuel takes place and then firing of new portion of fuel is performed using kindling fuel for supporting this process.
  • Page 16 For the period of brake time, water should not be drained out of boiler and installation. If boiler’s stopping took place in emergency conditions, glowing fuel shell be removed into metal box and taken out of boiler room, or alternatively the gloving fuel may be covered with sand.
  • Page 17 burning inadequate apply proper quality fuel (see fuel chapter "Fuel" p. 6) boiler power not up to heating area improper design and erection of heating installation Improper functioning of adjust controller’s settings up controller, fan weather conditions or quality of fuel, if controller does not work properly consult manual Smoking...
  • Page 18: Terms Of Delivery

    PROTECTION MEANS In order to ensure the failure-free and safe operation (to maximum extent) the controller of boiler is provided with many protection functions. If faulty status is discovered, the alarm is launched (acoustic signal), and a message is shown on display (depending on controller version).
  • Page 19: Terms Of Warranty

    TERMS OF WARRANTY 1. Manufacturer grants warranty for proper functioning of the heating boiler SAS MI, what is confirmed with the stamp of factory. 2. Manufacturer grants warranty for efficient the boiler installed and operated according to all terms and recommendations included to Technical -Start-Up Documentation (TSD).
  • Page 20 Any remarks and questions on boiler’s SAS type exploitation shall be addressed: ZAKŁAD METALOWO-KOTLARSKI Owczary, ul. Przemysłowa 3 28-100 Busko - Zdrój Tel.: +4841/378 46 19 Fax: +4841/370 83 10 http:// www.sas.busko.pl...
  • Page 21 SERVICE REPAIRES...
  • Page 22: Warranty Card

    ∗ ∗ ∗ ∗ According to presented conditions 48 (24 ) months warranty is given for low – temperature boiler of SAS MI type installed and operated in pursuance of Technical Start - Up Documentation. Boiler no................Heating capacity .................

Table of Contents