Download Print this page

ABSCO SHEDS 45232WK Assembly & Instruction Manual page 37

Workshop shed
Hide thumbs Also See for 45232WK:

Advertisement

FINAL CONSTRUCTION
STEP 1.
Secure the roof panels to the wall panels
as shown.
STEP 2.
Secure the roof panels to the internal
frames with self drilling tek screws.
STEP 3.
Secure the portal frames to the ridge
beam as detailed on the previous page.
STEP 4.
Bend the top and bottom flanges as
shown, then hook the bottom flanges
under the top channel and screw top to
the ridge beam with two screws.
D
D
D
Each anchor consists of one nut, bolt, M10
dynabolt and steel angle.
Drill a 10mm hole into the wall sheet.
Drill a 10mm hole into the concrete.
Absco Industries
Assembly Instruction Manual
ABSCO WORKSHOP SHED
MODEL: 45232WK
4.48mW x 2.26mD x 2.00mH
D
D
D
D
D
D
Refer to section
PORTAL FRAME
for portal anchor
locations.
D
D
D
D
D
D
Bolt and Nut*
M10 4.6/S
Steel Angle*
45 x 45 x 3EA
34LONG G450
2x 130 Ø Holes
M10 Dynabolt*
* Denotes hot dip galvanised fi nish
Model: 45232WK
ANCHORING OF SHED
Location of 20 concrete
anchors.
D
D
D
D
D
15
Slab
27/09/2018
1.30
Wall Sheet
37

Advertisement

loading