Setup Of Device Under Test (Dut); Figure 21. Setup Of Device Under Test With At Commands - Panasonic eUniStone Application Note Design Manual

Table of Contents

Advertisement

9.2

Setup of Device Under Test (DUT)

Doing RF test with a test instrument like the R&S CBT or similar, controlling testing over the air, can be
performed with the SPP software using the SPP Toolbox.
After attaching the device to the computer and opening COM port, follow the below sequence.
1. Enable production mode
2. Enable Device Under Test
3. Read BD-data (Note the BD-address to be used for the connection of the CBT)
4. Search and connect with the CBT
1
2

Figure 21. Setup of Device Under Test with AT commands.

When the CBT is connected to eUniStone, all control of the RF measurements is done by the CBT over
the air.
Application Note
Design Guide
3
52
PAN1322
Revision 1.2, 2013-12-18

Advertisement

Table of Contents
loading

Table of Contents