OPT3004EVM Software
3.4
OPT3001EVM Software Operation
This section primarily discusses how to operate the OPT3001EVM software. The GUI has a primary
window that is used to configure and read from the OPT3004EVM, along with two other windows that are
used to access different features of the OPT3004EVM. Basic GUI functionality and a description of the
tabs are also presented in this section.
3.4.1
Getting Started
With the hardware properly connected and the EVM software installed and operating, check to see that
the power to the device is turned on by looking at the LED on the SM-USB-DIG board and at the VDUT
indicator on the SM-USB-DIG tab in the GUI software, as shown in
If the hardware address of the OPT3004EVM on the EVM board has not been reconfigured, then the
address fields shown on the SM-USB-DIG tab in
10
OPT3004EVM User's Guide
Figure 11. Power Indicators
Figure 12
Copyright © 2018, Texas Instruments Incorporated
Figure
11.
are set up correctly.
SBOU220 – December 2018
Submit Documentation Feedback
www.ti.com