OPT3004EVM Hardware
Figure 5
shows the typical response when the SM-USB-DIG is plugged into the USB port of the computer
for the first time. Typically, the computer responds with a Found New Hardware, USB Device pop-up
dialog window. The pop-up window then typically changes to Found New Hardware, USB Human Interface
Device. This pop-up indicates that the device is ready to be used. The SM-USB-DIG Platform uses the
human interface device drivers that are part of the Windows
Figure 5. Typical Response After Connecting OPT3004EVM to the Computer
In some cases, the Add Hardware Wizard appears. If this installation prompt occurs, allow the device
manager to install the human interface device drivers by clicking Yes at each request to install the drivers.
6
OPT3004EVM User's Guide
Figure 4. Typical Hardware Connection
Copyright © 2018, Texas Instruments Incorporated
operating system.
®
SBOU220 – December 2018
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the OPT3004EVM and is the answer not in the manual?