Overview
1.2
Related Documentation from Texas Instruments
The following documents provide information regarding Texas Instruments' integrated circuits used in the
assembly of the OPT3004EVM. This user's guide is available from the TI web site under literature number
SBOU220. Any letter appended to the literature number corresponds to the document revision that is
current at the time of the writing of this document. The latest revision can be found by clicking the link
Table 2
and is also available from the
(800) 477-8924, and the Product Information Center at (972) 644-5580. When ordering, identify the
document by both title and literature number.
2
OPT3004EVM Hardware
Figure 2
shows the system setup for the OPT3004EVM. The computer runs the graphical user interface
(GUI) software that communicates with the SM-USB-DIG over a USB connection. The SM-USB-DIG
translates the USB commands from the computer into power, I
input/output (GPIO) commands for the OPT3004 test board. The OPT3004EVM does not require any
additional components to operate.
4
OPT3004EVM User's Guide
TI web
site, the Texas Instruments' Literature Response Center at
Table 2. Related Documentation
Document
OPT3004 product data sheet
SM-USB-DIG_Platform user's guide
Figure 2. OPT3004EVM Hardware Setup
Copyright © 2018, Texas Instruments Incorporated
Literature Number
SBOS929
SBOU098
2
C, SPI™, and general-purpose
Submit Documentation Feedback
www.ti.com
SBOU220 – December 2018
Need help?
Do you have a question about the OPT3004EVM and is the answer not in the manual?