Milwaukee 5339-20 Repair Instructions page 21

Sds max demolition hammer sds max rotary hammer
Hide thumbs Also See for 5339-20:
Table of Contents

Advertisement

REPAIR
INSTRUCTIONS
Combined
1 Install complete spindle assembly (1) into
gear box (2) as far as it will go, aligning ex-
drill/chisel
ternal splines on spindle (1) with internal
hammer:
splines of previously installed spindle bev-
el gear.
Installing the
Piston assembly must enter the rear/end
spindle
of spindle assembly!
Spindle assembly (1) gets the necessary
lubrication when it is inserted into gear
box (2).
Chisel
1 To prepare, place o-ring (1), washer (2)
and locking ring (3) into gear box (5).
hammer:
2 Install complete spindle assembly (4) into
gear box (5) and lead it through o-ring (1),
Installing the
washer (2) and retaining ring (3).
spindle
Spindle (4) gets the necessary lubrication
when it is inserted into gear box (5).
3 Insert spindle (4) as far as it will go.
Piston (6) must enter the rear/end of spin-
dle!
4 Install retaining ring (3) completely into
spindle groove.
The retaining ring (3) must audibly
engage into the spindle groove!
Retaining ring (3) must be spread slightly
when installing spindle assembly.
58-92-5305 d1
2
1
3
1
2
4
PAGE
21
5