Initial Power-Up And Test; Web Interface; Terminal Interface - FLIR PTU-5 User Manual

High-performance pan-tilt unit
Table of Contents

Advertisement

4.7 - Initial Power-Up and Test

This section describes how to power up and test your PTU using either the Web or serial interface. Test
and verify all cable connections and connector wiring before power-up.
Note: Complete the initial installation and testing, then exercise the PTU and familiarize
yourself with its operations and commands before mounting your payload (such as a
camera).

4.7.1 - Web Interface

To test the PTU using the Web interface, follow the procedure in
connect the PTU, power on the unit, and access the Web interface.
The Web interface has a number of pages, including:
• PTU Config: Allows you to configure speed, acceleration, and power options.
• Network: Allows you to configure the PTU's IP and MAC addresses.
• PTU Control: Allows you to control the PTU. Use this page to test PTU motion and exercise the unit.
Please see the Pan-Tilt E Series Command Reference Manual for more information about the Web
interface.

4.7.2 - Terminal Interface

To test the PTU using the serial interface:
1. Configure the RS-232 or RS-485 port on the host computer as described in
page
13.
2. Power up the PTU. A boot message will appear on your terminal screen and the unit will begin a
reset cycle. An asterisk (*) appears on your screen when the reset cycle is finished. If the PTU did not
reset properly, please refer to the troubleshooting instructions below.
3. Please see
"Serial Command List" on page C-4
Command Reference Manual for a complete list of commands and associated parameters and other
usage instructions.
Chapter 4: Installation & Setup
for a list of basic commands, and the Pan-Tilt E Series
Copyright 2017, FLIR Commercial Systems, Inc.
"Ethernet Connection" on page 11
"Serial Connection" on
to
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents