Prepare The Installation Site; Mount The Unit; Rack Or Cabinet Mounting - ProCurve zl Series Installation And Getting Started Manual

Power supply shelf
Table of Contents

Advertisement

Installing and Connecting the External Power Supply Shelf
Installation Procedures

1. Prepare the Installation Site

2. Mount the Unit

The Power Supply Shelf can be mounted in these ways:

Rack or Cabinet Mounting

The Power Supply Shelf is designed to be mounted in any EIA-standard 19-
inch telco rack or communication equipment cabinet. The mounting brackets
have multiple mounting holes and can be rotated allowing for a wide variety
of mounting options.
W A R N I N G
For safe operation, please read the installation precautions on
page
E q u i p m e n t
The 12-24 screws supplied with the unit are the correct threading for standard
C a b i n e t
EIA/TIA open 19-inch racks. If you are installing the unit in an equipment
cabinet such as a server cabinet, use the clips and screws that came with the
N o t e
cabinet in place of the 12-24 screws that are supplied with the unit.
1.
2-4
Cabling - Only use the EPS cables supplied with the unit for external
power connections to switches.
Installation Location - Before installing the unit, plan its location and
orientation relative to other devices and equipment:
In both the front and back of the unit, leave at least 7.6 cm (3 inches)
of space for the EPS cables, and the power cord.
On the sides of the unit, leave at least 7.6 cm (3 inches) for cooling.
in a rack or cabinet
on a horizontal surface
2-3, before mounting the unit.
Use a #1 Phillips (cross-head) screwdriver and attach the mounting
brackets to the unit with the included 8-mm M4 screws. The screws must
be tightened sufficiently to provide proper support for the unit in the rack.