3 G E T T I N G S TA R T E D

3 Getting started

3 1 Unpacking the UPS

3 1 1
04 Unpacking
Inspect the packaging and its contents for
the system
damage. Inform the transport agency
immediately if you find signs of damage.
Keep the packaging in a safe place for future use.
3 1 2
1. Open the outer carton and take out the
accessories.
2. Lift the UPS from the outer carton carefully,
remove the foam, and set the UPS on a flat,
stable surface.
04

Inspection

Unpacking the system

DISCARD OR RECYCLE THE PACKAGING IN
A RESPONSIBLE MANNER OR STORE IT
FOR FUTURE USE.
THE CABINET IS HEAVY. SEE THE WEIGHT
PROVIDED ON THE PACKAGING/LABEL.
NOTE
11