Risk Assessment for the SCADADroid R2
JOB: Installation of R2 by a plant operator, technician, programmer or engineer
Job Task, Activity
Health and Safety
and equipment
Hazards
Potential explosion
Removing power
causing equipment
and Ethernet
damage and
connectors when
personal injury or
in hazardous areas
death
Component damage
Remove top of
from having the unit
unit to install SIM
powered on
Shock from having
the unit powered on
Power up and
IP conflict that takes
configure
out other networks
Install in electrical
Overload panel
panel
48
Support
Frequency
Risk
of exposure
Severity
Yearly
High
Once
Low
Once
Low
Once
Low
Once
Low
By Reonix Automation Inc
Risk
Control
Probability
De-energize
equipment or
explosive gases are
Possible
not present before
emoving connectors
Remove power
Possible
before starting
Remove power
Unlikely
before starting
Confirm IP address
Possible
not used before
powering up
Possible
Fuses in panel