3. Installation
3.1 Unpacking and Contents Check
Packing materials must be disposed of in compliance with all local regulations concerning waste.
Recycling symbols are printed on the packing materials to facilitate sorting.
3.2 Rack Installation
Follow Steps 1 through 4 for mounting the UPS on the rails.
The rails and necessary hardware are supplied by Eaton.
Page 12
5P UPS
1U Rack Kit
1
Quick Start
Safety Instructions
Front Panel Parts
1
2
3
4
RS232 Communication Cable
USB Communication Cable
2
3
4